3

3.13.4

Installation

is

 

Finalising

1.Shut off the gas supply.

2.Disconnect the two pressure gauges and retighten the sealing screws in the test nipples.

3.Replace the cover.

Note

Before starting-up the appliance, take time to fill in the warranty card

supplied with the appliance. This enables us to guarantee the quality of our systems, and to further enhance our warranty procedure.

Please return this card as soon as possible. Your customer will then receive a warranty certificate with our warranty conditions.

44

Instruction manual SGE

Page 44
Image 44
A.O. Smith SGE service manual 13.4, Finalising