Instruction manual SGE 27
is
3.6 Water connections, Unvented
Warning
The installation should be carried out by an authorised installation engineer,
in compliance with general and local regulations (1.3 "Regulations").
3.6.1 Cold water side
See (A) in the installation diagram (3.5"Installation diagram").
1. Fit an approved stop valve (4) on the cold water side as required by
applicable regulations (1.3 "Regulations").
2. The maximum working pressure of the appliance is 8 bar. Because the
pressure in the water pipe at times can exceed 8 bar, you must fit an
approved pressure-reducing valve (1).
3. Fit a non-return valve (5) and an expansion vessel (16).
4. Fit an expansion valve (15) and connect the overflow side to an open
wastewater pipe.
3.6.2 Hot water side
See (B) in the installation diagram (3.5"Installation diagram").
Note
Insulating long hot water pipes will prevent unnecessary energy loss.
1. Optional: fit a temperature gauge (12) so you can check the temperature of
the tap water.
2. Fit the T&P valve (3).
3. Fit a stop valve (11) in the hot water outlet pipe for servicing.
3.6.3 Circulation pipe
See (C) in the installation diagram (3.5 "Installation diagram").
If an immediate flow of hot water is required at draw-off points, a circulation
pump can be installed. This improves comfort and reduces water wastage.
1. Fit a circulation pump (6) of the correct capacity for the length and resistance
of the circulation system.
2. Fit a non-return valve (5) behind the circulation pump to guarantee the
direction of circulation.
3. Fit two stop valves for service purposes (4).
4. Connect the circulation pipe to the cold water supply pipe.
Legend
Only applicable numbers are
mentioned.
1. pressure-reducing valve
(mandatory if the mains water
pressure exceeds 8 bar)
3. T&P valve (mandatory)
4. stop valve (recommended in pipe C
and mandatory in pipe A)
5. non-return valve (mandatory)
6. circulation pump (optional)
9. drain valve (mandatory)
10.manual gas valve (mandatory)
20.pressure valve (mandatory)
26.air bleed (mandatory)
11.service stop valve (recommended)
12.temperature gauge
(recommended)
13.condensation drainage
(mandatory)
14.hot water draw-off points
15.expansion valve (mandatory)
16.expansion vessel (mandatory)
17.3-way aeration valve
(recommended)
18.water tank
19.float valve
23.pressure valve (mandatory)
37.combined Q/T sensor (optional)
38.solar heating system pump station
(modulating - mandatory)
A. cold water supply
B. hot water supply
C. circulation pipe
D. gas supply
E. overflow pipe
F. heat exchanger supply
G. heat exchanger return
H. overflow safety
S1.collector sensor (mandatory)
S2.tank sensor (mandatory)
S4.heat exchanger discharge sensor
(optional)