| Chapter 1: Understanding ISDN and the Express L128/L128T | ||||
WAN Indicators |
|
|
|
|
|
PWR | Flashes when the link is inactive; solid when the link is active. | ||||
B1 | Flashes green when the link is being negotiated; off when the | ||||
| link is active. After the link is active, B1 flashes green when a | ||||
| call on B1 channel is in progress; solid green when a call is | ||||
| connected. |
|
|
|
|
B2 | Flashes green when the link is being negotiated; off when the | ||||
| link is active. After the link is active, B2 flashes green when a | ||||
| call on B2 channel is in progress; solid green when a call is | ||||
| connected. |
|
|
|
|
Test Indicators |
|
|
|
|
|
B1/B2 | A slow amber flash indicates test in progress; a fast amber | ||||
| flash indicates test has failed. |
|
|
| |
|
| TX/RX | B1 | B2 | PWR |
| LI |
| |||
|
|
|
| ||
|
|
|
|
| |
| EXPRESSL128T |
|
|
|
|
|
|
|
| TEST | LINE |
|
|
|
|
|
Figure
Express L128/L128T LEDs
Express L128/L128T User Manual | 17 |