Alcatel-Lucent 6600 Series, 6648, 6624 manual Tightening the Captive Screws, Link/Act Link/Act

Models: 6600 Series 6624 6648

1 114
Download 114 pages 33.13 Kb
Page 50
Image 50
LINK/ACT

Installing Uplink and Stacking Modules

OmniSwitch 6600 Series Chassis and Hardware Components

 

 

 

 

3Slide the module back until the backplane connector is inserted in the chassis backplane; the module’s front panel should be flush with the front of the chassis. Do not force the module into the slot. Otherwise you can damage the connectors.

4Once the module is firmly seated and flush with the chassis front panel, secure the module by tighten- ing the two captive screws. Be sure not to overtighten the captive screws. If you use a screwdriver, the torque used to tighten the screws must not exceed 2.3 inch pounds.

5

2

 

Manual backgroundLINK/ACT

LINK/ACT

Tightening the Captive Screws

page 2-30

OmniSwitch 6600 Series Hardware Users Guide April 2004

Page 50
Image 50
Alcatel-Lucent 6600 Series, 6648, 6624 manual Tightening the Captive Screws, Link/Act Link/Act