Alcatel-Lucent 6624, 6648 Booting the Stack, Verifying Slot Number Assignments, Pri Led, Sec Led

Models: 6600 Series 6624 6648

1 114
Download 114 pages 33.13 Kb
Page 94
Image 94
Booting the Stack

Setting Up a Stacked Configuration

Managing OmniSwitch 6600 Series Stacks

 

 

 

 

Booting the Stack

In order for the switches in the stack to operate using their newly-assigned slot numbers, all switches in the stack must be manually booted.

Important. Whenever booting a stacked configuration, note that the primary switch will automatically distribute its system and configuration software to all switches in the stack whenever the virtual chassis boots. During this automatic software synchronization, system and configuration software on the second- ary and idle switches is overwritten. Because the primary switch’s “last known good” software is propa- gated to all switches, the synchronization process helps ensure effective redundancy across the stack.

To manually boot the stack, follow the steps below.

1Power on all switches by moving the on/off switch for each switch to the on ( ) position.

Important. Be sure to power on all switches in the stack in rapid succession. If you do not power up all switches within approximately three seconds, switches may take unintended stack management roles.

2If back up power supplies are installed in one or more switches in the stack, power on all back up power supplies at this time.

Verifying Slot Number Assignments

After the stack is completely booted, all switches in the stack operate using the user-assigned slot numbers. To verify the slot numbers for each switch, refer to the slot indicator LED on the front panel of each switch. For more information, refer to “Status LEDs” on page 2-11.

Verifying Primary and Secondary Status for the Stack

Primary, Secondary and Idle switch status is indicated by the PRI and SEC LEDs. The PRI and SEC LEDs on the switch’s front panel are the most accurate and reliable method for determining the current role of a switch within a stacked configuration.

PRI LED

Now that the stack has been configured and booted, the primary—or management—role should be assigned to the switch with the lowest assigned slot number. In other words, if you assigned a switch in the stack as slot 1, this switch should have the primary role.

To verify this, check the PRI LED on the front panel of the switch with the lowest assigned slot number. The PRI LED should be illuminated solid green.

SEC LED

The secondary role is given to the switch with the next-lowestnumber.

To verify this, check the SEC LED on the front panel of the switch with the next-lowest assigned slot number. The SEC LED should be illuminated solid green.

page 3-14

OmniSwitch 6600 Series Hardware Users Guide April 2004

Page 94
Image 94
Alcatel-Lucent 6624, 6648, 6600 Series manual Booting the Stack, Verifying Slot Number Assignments, Pri Led, Sec Led