Image 24

Output Relay 1:

1.Minor and Major output relays were tested in the rectifier test section.

2.Change the alarm to desired relay output via the controller for any relay output that will be used. All alarm parameters are shipped as either major or minor, but may be changed to output relay 1.

3.Program output relay 1 to desired major or minor alarm to complete programming.

4.Exercise the output relay by causing the alarm to change state.

Battery Temperature Compensation

1.Enable battery temperature compensation if desired.

2.Ensure that battery temperature probe is connected to the system and attached to the battery.

3.Verify that the system voltage is above the float voltage setting if the battery temperature is below 25 degrees C and below the float voltage setting if the battery temperature is above 25 degrees C.

4.3.Final Inspection:

1.Verify that the interior and exterior of the system is clean and free from debris.

2.Ensure all wires connected and bolts are properly tightened.

3.Ensure the following the User, Service, and Calibration parameters are set properly on the controller:

LVD

LVD1 Trip LVD1 Reset

Battery Parameters Discharge Threshold Float Voltage Maximum Recharge Compensation Method

4.Verify that the system is functioning correctly with no alarms.

Be sure to leave the site as orderly and neat as possible.