Baldor AE8, AE11, AE10 Single Phase Power Connections, 7 Single Phase Output Power Connections

Models: AE8 AE25 AE10 AE11

1 74
Download 74 pages 35.07 Kb
Page 23
Image 23
Figure 3-7 Single Phase Output Power Connections
To 120VAC (Shore Power)
Out−
Battery
Charger
16AWG Customer Provided Optional Equipment
Twisted Pair WireRemote Start Switch (Close to Start)
Out+
Figure 3-8shows the connections for the battery charger and the remote start contacts of the transfer switch. When the Remote Start Switch is closed, the generator will start. The unit will remain running until this connection is opened. When the Remote Start Switch is opened, the control circuits allow the engine to run for approximately 60−90 seconds before it shuts off. This time delay allows the engine to run unloaded to cool down before stopping.
Figure 3-8 Remote Start & Battery Connections

AE11 Electrical Connections Applies only to AE11 Enclosed Series Generators

Single Phase Power Connections

The generator has a 240V single phase AC output. These connections are made at the power terminal box shown in Figure 3-7.

Figure 3-7 Single Phase Output Power Connections

AE11 with Enclosure

TBP

 

L1

L1

 

Customer

 

L2

L2

 

 

AC Output Connections

Generator

L3

 

 

(to Transfer Switch)

Output

N

N

 

 

(Jumpered)

N

 

 

 

 

G

 

L1 to N

120VAC

(Jumpered)

G

 

L2 to N

120VAC

 

L1 to L2

240VAC

 

 

 

BW0459D

Remote Start and Battery Charger Connections

AE11

with Enclosure

TBP

L1Remote Start and Battery Charger Connections

N

GFuel Jumper

Remote Start

Remote Start

Fuel Jumper Manual background

Fuel Jumper

Fuel Jumper

IN = Natural Gas

OUT = LPG

Note: Remove Fuel Jumper

BW0459D

if LP Gas is used.

+

Battery

MN2415

Receiving & Installation 3-11

Page 23
Image 23