Baldor AE11, AE10, AE25, AE8 Figure C-5, Figure C-6, L1 GEN, L2 GEN, L3 GEN, N Gen, G Gen, Terminal

Models: AE8 AE25 AE10 AE11

1 74
Download 74 pages 35.07 Kb
Page 60
Image 60
Figure C-5

7.Remove the insert from the 90° elbow, Figure C-5.

8.Connect the hose and hose clamp to the 90° elbow.

Figure C-5

90° Elbow with LPG

Hose (fuel line) and

Insert removed.

clamp installed

Insert

9.Remove the control box cover by removing the six 7/16” bolts. to gain access to the customer connection terminal strips.

10.Remove the jumper assembly attached to the demand regulator.

11.Locate the two terminals labeled FUEL JUMPER and connect the jumper assembly between them.

12.Install the control box cover and the front panel. The unit has now been converted to operate on Natural Gas.

Figure C-6

 

L1 GEN

 

L2 GEN

Jumper attached

L3 GEN

N GEN

to K−N Regulator

 

 

N

 

G GEN

 

Grounding

 

Electrode

 

Terminal

L1 BAT Charger Figure C-6L1 GENL2 GENL3 GEN

N BAT Charger N GENG GENTerminalL1 BAT Charger

G BAT Charger Manual backgroundManual backgroundManual backgroundManual background

Remote Start Manual backgroundManual backgroundManual backgroundManual background

Remote Start Manual backgroundManual backgroundManual backgroundManual background

Fuel Jumper Manual backgroundManual backgroundManual backgroundManual background

Fuel Jumper Manual backgroundManual backgroundManual backgroundManual background

Wiring Diagrams Wiring diagrams for these generators are contained on the following pages of this appendix.

C-4 Series AE11

MN2415

Page 60
Image 60
Baldor AE11, AE10, AE25, AE8 manual Figure C-5, Figure C-6, L1 GEN, L2 GEN, L3 GEN, N Gen, G Gen, Terminal