Baldor Section Receiving & Installation, 1 Generator Lifting & Mounting, AE8 & AE10, AE11

Models: AE8 AE25 AE10 AE11

1 74
Download 74 pages 35.07 Kb
Page 13
Image 13
Section 3

Section 3

Receiving & Installation

Receiving & Inspection When you receive your generator, there are several things you should do immediately.

1.Observe the condition of the shipping container and report any damage immediately to the commercial carrier that delivered your system.

2.Verify that the part number of the system you received is the same as the part number listed on your purchase order.

3.If the system is to be stored for several weeks before use, be sure that it is stored in a location that conforms to published storage temperature and humidity specifications.

Lifting the Generator When lift or hoist equipment is used to lift the generator and move it to position, be careful not to contact overhead wires or other obstacles. The generator can weigh as much as 1,500 lbs. Be sure lift or hoist equipment has appropriate tires for the terrain to avoid becoming stuck or tipping over. If the shipping pallet is intact, use a fork lift to move the generator. If the shipping pallet has been removed, use two steel pipes through the “Lift Point” holes to lift the generator. See Figure 3-1.

Figure 3-1 Generator Lifting & Mounting

Not To Scale

 

AE8 & AE10

 

Four mounting

 

2.63

Length

 

 

 

holes 0.38" dia.

8.88

 

 

8.88

 

 

Electrical

 

 

 

 

 

Stub Up

 

 

 

7.75

 

 

 

Fuel Inlet on

 

 

 

Horizontal Surface

 

Height

44.50

Lift Point

Lift Point

Width

 

(Alternator End)

29.00

Thru Base

All dimensions are in inches.

Stub Up Area

 

 

1.50

AE11

 

 

Stub Up

 

6.00

Access Panel

 

(Fuel & Electrical)

 

4.52

1.50

 

 

 

 

 

42.00

 

 

46.00

 

 

28.00

Four mounting

 

 

holes 0.38" dia.

 

29.29

 

 

 

 

(Alternator End)

LT0143A30

 

30.29

Six mounting

 

AE25

 

 

 

 

holes

0.410" dia.

 

30.00

 

 

 

 

 

 

24.00

 

 

 

 

 

 

3.19

 

 

 

Fuel Inlet

 

 

 

Zone

 

 

 

 

3.19

8.12

72.00

 

 

 

 

 

 

 

 

24.00

26.14

Electrical

 

 

 

 

 

 

Stub Up

 

 

 

 

20.94

 

 

 

 

 

 

 

(Alternator End)

 

 

LT0143A02

 

31.25

 

 

 

 

 

MN2415

Receiving & Installation 3-1

Page 13
Image 13
Baldor manual Section Receiving & Installation, 1 Generator Lifting & Mounting, AE8 & AE10, AE11, AE25