1.8.1HYDROSTATIC TEST OF BOILERS AND SYSTEM

After completing the boiler and burner installation, the boiler connections, fittings, attachments and adjacent piping must be inspected for leaks by filling the unit with water. The pressure should be gradually increased to a pressure just below the setting of boiler safety relief valve(s).

Remove the boiler tube access panels (see dimensional drawing in the boiler manual). Inspect the tube to header joints to be certain that all tube fittings are sealed. This is necessary because, although the boiler is hydrostatically tested at the factory, minor leaks in fittings and at attachments can develop from shipping vibration or from installation procedures. It is often necessary to retighten such fittings after installation and after the boiler has been operated for some time. Replace tube access panels before proceeding to start boiler.

1.8.2TEST OF GAS PIPING

Reference the gas system test under paragraph

Gas Supply Connection, in this manual.

9

Page 15
Image 15
Bryan Boilers 200, Triple-Flex 150, 250, & 300 service manual Hydrostatic Test of Boilers and System, Test of GAS Piping