Note:

Please read and save for future reference the entire instruction manual before attempting installation of or starting the unit. Insurance and local or state regulatory codes may contain additional or more stringent requirements than those contained in this manual. Installation must conform to these codes and any other authority having jurisdiction. This instruction manual shall be posted and maintained in a legible condition.

1.1BOILER FOUNDATION

Before uncrating, the boiler location should be prepared. The boiler should set upon a good level concrete floor. If the boiler is not level or the floor is not in good condition, a concrete foundation should be built, the dimensions being larger than the outside dimensions of the boiler base. A 4” high housekeeping pad is suggested.

WARNING:

Do not install boiler on combustible flooring.

1.2CLEARANCES

See Table 1 for minimum clearances to walls, ceilings, or obstructions. The clearances in Table 1 are intended as a general recommendation only. Local codes must be applied to specific installations and the minimum clearances established accordingly. Provisions must also be made for service, accessibility and clearance for piping and electrical connections. Do not obstruct combustion air and ventilation openings with piping or any other construction. All boilers must be installed in a space that is large compared to the boiler.

NOTE:

These boilers should be installed in a room that is large compared to the size of the boiler. They are not intended for alcove installation and are suitable for installation on non-combustible flooring only. Adhere to all applicable local codes regarding boiler installation and clearances.

Date: 8-4-2010

Revision: 0

Form: 2396

1.2.1MINIMUM CLEARANCES TO COMBUSTIBLE SURFACES

Figure 1 Minimum Clearances

DIM.

Description

 

 

Triple-Flex

 

 

150 - 300

 

 

 

 

 

A

Clearance Above Top of

18”

 

Boiler

 

 

 

 

B

Right Side

 

 

18”

C

From

Chimney

or

Vent

18”

Collector

Measured

 

Horizontally

 

 

 

D

Left Side – Tube Access

27”

Side

On

Standard

 

Construction

 

 

 

 

From

Chimney

or

Vent

 

E

Collector

Measured

18”

 

Vertically

 

 

 

F

Front of Boiler – Gas Train

48”

 

& Control Panel End

 

 

 

Rear

of Boiler

Opposite

 

G

Gas Train & Control Panel

18”

 

End

 

 

 

 

Table 1

Minimum Clearance

 

 

 

1.3RECEIVING THE BOILER

The boiler is shipped from the factory with (4) shipping feet/legs bolted to the skids. These are provided to facilitate unloading/moving with a forklift. Lifting lugs are also provided to enable over-head lifting. The shipping feet/legs MUST

2

Page 8
Image 8
Bryan Boilers Triple-Flex 150 Boiler Foundation, Minimum Clearances to Combustible Surfaces, Dim, Receiving the Boiler