Date:

8-4-2010

 

Revision:

0

 

Form:

2396

2.2.11 Operation Page

22

2.2.12 Annunciation Page

23

2.2.13 Modulation Configuration

23

2.2.14 Firing Rate Control Page

23

2.2.15 Advanced Setup

24

2.2.16 System Time

24

2.2.17 Calibrate Touch Screen

24

2.2.18 Reset / Reboot Display

25

2.2.19 Outdoor Reset

25

2.2.20 Remote Setpoint (4 – 20 mA)

26

2.2.21 Central Heat Configuration

27

2.2.22 Sound Pressure Levels

27

2.2.23 Modbus Communication

29

2.2.24 Alert Codes

29

2.3

Boiler Commissioning

35

2.3.1 Modulation

35

2.3.2 Test Setup

35

2.3.3 Pre Checks And Setup

35

2.3.4 Dry Run

36

2.3.5 Pilot Adjustment

36

2.3.6 Initial Light Off

37

2.3.7 Adjusting Boiler Maximum Input

37

2.3.8 Adjusting Boiler Minimum Input

37

2.3.9 Gas Meter Readings

38

2.4

Troubleshooting

39

Section 3 Care and Maintenance

50

3.1

Cleaning The Boiler And System – New Systems

51

3.1.1 Pre-Boil Out Flushing Of System

51

3.1.2 Boil Out Procedure

51

3.1.3 Draining The System

52

3.2

Replacement Boiler Installations: Protection Against Corrosion And Sediment

52

3.3

Boiler Water Treatment

52

3.4

External “Fire-Side” Cleaning

53

3.5

Suggested Maintenance Schedule

53

Section 4 Lead Lag

55

4.1

General Description Of The Lead Lag Application

56

4.2

Lead Lag (Ll) Master General Operation

56

4.3

System Wiring Hookup

58

4.4

Lead-Lag Operation

59

4.5

Slave Operation And Setup

60

4.6

Slave Parameters

60

4.7

Ll Master Operation And Setup

61

4.7.1 Overall Control

61

4.7.2 Periodic Data Polling messages

62

4.7.3 Slave Status Manager

62

4.7.4 Master Active Service

65

4.7.5 Modulation Sensor

65

4.7.6 Demand and Rate

66

4.7.7 Rate Adjustment

67

4.7.8 Implementation

67

4.7.9 Rate Allocation

68

4.7.10 Burner Demand

70

4.7.11 Lead Drop-Stage On Error - LDSE:

73

iv

Page 4
Image 4
Bryan Boilers Triple-Flex 150, 250, & 300, 200 service manual Lead Drop-Stage On Error Ldse