Installing the 2H28-08R
Installation
Rack mounting the 2H28-08R involves the following:
•Attaching the strain-relief bracket
•Rack mounting the 2H28-08R (attaching the mounting brackets and fastening the 2H28-08R to the rack)
Attaching the Strain-Relief Bracket
Use of the strain-relief bracket is optional, but recommended in order to reduce cable damage and maintain an orderly environment.
Attach the strain-relief bracket to the front of the 2H28-08R as follows:
1.Locate the strain-relief bracket and four 8-32 x 5/16-inch pan-head screws in the rackmount kit.
Do not attempt to attach the strain-relief bracket with screws
!other than the 8-32 x 5/16-inch screws included with the
CAUTION | 2H28-08R. Use of longer screws may damage the unit. |
|
2.Attach the strain-relief bracket to the bottom of the 2H28-08R using the four 8-32 x 5/16-inch pan-head screws (Figure 3-2).
Screws (4)
Strain-Relief Bracket
| COM | 51-2E43 |
CPU | RESET |
PWR | | |
1 LINK | | |
| E2 | E1 |
| E4 | E3 |
1 LINK | | |
2251-47
Figure 3-2 Attaching the Strain-Relief Bracket
2H28-08R SmartSwitch 2208 User’s Guide | 3-5 |