1 | Make sure all components are installed according | PREPARING FOR | |
to assembly drawings. Make sure that all bolts on the cut- | |||
| |||
| ter have been tightened. | TESTING | |
|
| ||
2 | Check that cutter is firmly locked into position |
| |
| with the anchoring screws. |
| |
| Check that all wiring conforms to electrical |
| |
3 |
| ||
| codes, and all wiring covers are in place. |
| |
|
|
| |
| Locate the main disconnect switch on the front |
| |
1 | TESTING THE | ||
of the control cabinet. Turn it on. You should see the | |||
| |||
| Redlion interface illuminate and start communications | INSTALLATION | |
| and the yellow power light should now be on. |
2
Make sure the bushings and the blade doors are in place and secure. Check that the bushing access door is closed and the threaded knob is tight and the
3
4
Press the green start button. If the guard circuit is ready the green start button will now be illuminated.
Do a test cut, by pressing the black manual cut button. You should have caused the flywheel to com- plete on test cut.
5
To enable the cutter, push the center arrow key.
If for any reason any of these steps could not be achieved please refer to the troubleshooting section of the manual.
UGE059/1003 | INSTALLATION |