Conair SC-5 Preparing For, Testing The, Make sure all components are installed according

Models: SC-5

1 121
Download 121 pages 35.17 Kb
Page 33
Image 33
Make sure all components are installed according

1

Make sure all components are installed according

PREPARING FOR

to assembly drawings. Make sure that all bolts on the cut-

 

 

ter have been tightened.

TESTING

 

 

2

Check that cutter is firmly locked into position

 

 

with the anchoring screws.

 

 

Check that all wiring conforms to electrical

 

3

 

 

codes, and all wiring covers are in place.

 

 

 

 

 

Locate the main disconnect switch on the front

 

1

TESTING THE

of the control cabinet. Turn it on. You should see the

 

 

Redlion interface illuminate and start communications

INSTALLATION

 

and the yellow power light should now be on.

2

Make sure the bushings and the blade doors are in place and secure. Check that the bushing access door is closed and the threaded knob is tight and the E-stop is in the out position.

3

4

Press the green start button. If the guard circuit is ready the green start button will now be illuminated.

Do a test cut, by pressing the black manual cut button. You should have caused the flywheel to com- plete on test cut.

5

To enable the cutter, push the center arrow key.

If for any reason any of these steps could not be achieved please refer to the troubleshooting section of the manual.

UGE059/1003

SC-5 SURE CUT Servo Knife Cutter

INSTALLATION 3-13

Page 33
Image 33
Conair SC-5 manual Preparing For, Testing The, Make sure all components are installed according, Installation