Emerson 400276-01 operation manual Installation Overview, Safety

Models: 400276-01

1 48
Download 48 pages 45.25 Kb
Page 9
Image 9

525 Programmable Mo-

Installation

Installation Overview

The following installation requirements, methods and procedures are provided to ensure reliable and trouble free installation and operation of your Emerson Motion Control 525 PMC.

The methods and procedures are outlined on the following pages and include site requirements, safety, power and fusing requirements, wire and transformer sizing, noise suppression and I/O wiring.

The installer has the responsibility to comply with the safety requirements of the system. This includes installing the system with an appropriate master interlock switch for emergency shut down, using the proper wire and if necessary, transformer sizes to fit the system. This section will provide you with the information to complete a trouble free installation.

Safety

The user is responsible for providing emergency interlock switches that will remove AC power from the system any time the equipment is not running, or when the emergency stop is activated. This is to eliminate the possibility of electrocution or unwanted movement of the motor. The safety ground connections should only be disconnected for servicing, and only after all AC power has been removed. Even after the removal of AC power, there is a possibility of stored energy in the drives that must be dissipated before servicing. Failure to follow proper safety procedures can cause death or serious injury.

Disconnecting AC power does not immediately remove the stored energy in the bus capacitance and the external drive may continue to operate until this energy is dissipated. The time it takes to dissipate the energy in the bus capacitance greatly depends on the current being drawn out of the capacitors.

Page 9
Image 9
Emerson 400276-01 operation manual Installation Overview, Safety