Emerson 30-200kVA, 50 and 60 Hz SENXA0NBCWXX3LCB, Battery Installation, Ups To Ups To, Space Bcb

Models: 30-200kVA 400V 50 and 60 Hz

1 132
Download 132 pages 10.43 Kb
Page 44
Image 44
Figure 17 SENXA0NBCWXX3LCB

Battery Installation

Figure 17 SENXA0NBCWXX3LCB

Tray in Layer 1

W001

W001

W001

W001 W001

W001

W001

W001 W001

W001

W001

W001 W001

W001

W002

W002

W001

W001

Tray in Layer 3

W001

W001 W001

W001

W001

W001 W001

W001

W001

W001 W001

W001

W001

Tray in Layer 2

W001

W001

W001

W001 W001

W001

W001

W001 W001

W001

W001

W001

W001

W001

W002

W002

referto BCB BOX user instructions for cable connection. internalControl board used, temp. transport cables should be directly to external BCB control board. Meanwhile, the release function for the internal BCB is not needed. for:A412/32 G6.

BCB(125/200A)

W102

W101

W301

BLACK

RED

P NSPACEUPS TO UPS TO

N.O.

 

1-X101

 

 

 

 

 

3-X101

board

 

 

 

 

 

2-X100

Control

 

 

 

 

 

 

1-X100

BCB

 

4-X100

 

 

 

 

 

 

3-X100

 

 

 

 

X102-1 X102-2 X102-3 X102-4

 

X108-1 X108-2 X108-3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3-X106 2-X106 1-X106

3-X105 2-X105 1-X105

3-X104 2-X104 1-X104

BLUE 3-X103

2-X1031-X103Manual background RED

 

 

Temp. channels reserved for Batt. cabinet Paralleling

 

 

 

 

 

 

 

 

 

GREEN

GREEN

BLUE

RED

J1

GND

transport

 

OUT

Temp.

P12

1. Please

2. If no connected undervoltage 3. Used

NOTE:

 

 

 

 

SPACE

BCB

Layer 3

Tray master

Layer 2

Tray master

Layer 1

Tray master

FRONT VIEW

W302

UPS TO UPS TO

32

Page 44
Image 44
Emerson 30-200kVA, 50 and 60 Hz, 400V user manual SENXA0NBCWXX3LCB, Battery Installation, Ups To Ups To, Space Bcb