Emerson 50 and 60 Hz, 400V, 30-200kVA user manual SENXA0NBCN5LCB, Layer, Battery Installation

Models: 30-200kVA 400V 50 and 60 Hz

1 132
Download 132 pages 10.43 Kb
Page 42
Image 42
Figure 15 SENXA0NBCN5LCB

Battery Installation

Figure 15 SENXA0NBCN5LCB

W001W001

Tray in Layer 3

Tray in Layer 4

 

W001

 

 

 

 

 

W001

 

 

 

 

 

W001

 

 

Tray in Layer 5

 

 

 

 

W001

 

 

 

 

 

 

W002

W001

W001

W001

W001

 

W002

 

W002

W001

W001

W001

W001

 

W002

W001

W001

W001

W001

W101

 

 

 

W002

 

W001

W001

W001

Tray in Layer 2

W001

W001

W001

 

 

 

W002

 

 

W002

W001

W001

W001

Tray in Layer 1

 

W001

W001

W001

W001

 

 

W002

SPACE

BCB

FRONT VIEW

 

 

Layer 5

Layer 4

Layer 3

Layer 2

Layer 1

 

 

 

 

 

 

 

 

 

 

 

 

BCB(125/200A)

UPS TO

W102

RED

BLACK

P NManual backgroundManual background

N.O.

W301

1-X101

 

 

 

 

3-X101

board

 

 

 

2-X100

Control

 

 

 

 

1-X100

BCB

4-X100

 

 

 

 

3-X100

 

 

 

 

X102-1 X102-2 X102-3 X102-4

 

X108-1 X108-2 X108-3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W302

 

 

 

 

 

UPS TO

3-X106 2-X106 1-X106

3-X105 2-X105 1-X105

3-X104 2-X104 1-X104

BLUE 3-X103

2-X1031-X103Manual backgroundManual background RED

 

 

Temp. channels reserved for Batt. cabinet Paralleling

 

 

 

 

 

 

GREEN

GREEN

J1

BLUE

RED

GND OUT P12

Temp. transport

NOTE: 1. Please refer to BCB BOX user instructions for cable connection.

2. If no internal Control board used, temp. transport cables should be connected directly to external BCB control board. Meanwhile, the undervoltage release function for the internal BCB is not needed.

30

Page 42
Image 42
Emerson 50 and 60 Hz, 400V, 30-200kVA user manual SENXA0NBCN5LCB, Layer, Battery Installation