10.Replace the top cover on the ISM.
11.Fasten the top cover with the screws that were removed in step 3 and step 4.
12.Rack mount the switcher if desired and reconnect all cables.
Installing a Firmware Upgrade
In some cases the ISM firmware may require replacement with an updated version. There are nine
U6
U1
U2
U102
U103
U98
U99
U100
U101 Extron
ISM 482
Switcher
|
|
|
| 8 |
|
|
|
| 7 |
|
|
|
| R |
|
|
| 6 | R |
|
|
|
| |
|
| INPU | TS 5 |
|
|
| R | G | |
|
| 4 |
| |
|
| R |
| |
|
|
| G | |
| 3 |
|
| |
| R |
|
| |
|
| G |
| |
| 2 |
| B | |
|
|
| ||
| R |
| G |
|
1 |
|
| B | |
R |
|
| ||
| G |
|
| |
|
| B |
| |
R |
|
| /HV | |
G |
|
| H | |
|
| B | V | |
|
|
|
| H/H |
| G | B |
|
|
|
| H/HV |
| |
G | B |
| V |
|
|
|
| ||
|
|
| H/H |
|
| B | H/HV |
|
|
|
|
|
| |
B |
|
| 8 |
|
/HV |
| 7 |
| |
| H |
|
| |
| H/HV |
| 6 |
|
H/H | V | 5 |
|
|
|
|
|
| |
| 4 |
|
|
|
| 3 |
|
|
|
2
1
B
H/HV
V | V |
H/H | |
V |
|
Figure 50. ISM Firmware Chip Locations
•Chips U1 and U2 are replaced as a pair.
•Chip U6 is replaced alone.
•Chips U98, U99, U100, and U101 are replaced as a set.
•Chips U102 and U103 are replaced as a pair.
ATTENTION: Changes to firmware must be performed by authorized service personnel only. Some ISM firmware updates must be performed at the Extron factory.
Replace firmware in the ISM as follows:
CAUTION: Electric shock hazard. To prevent electric shock, always unplug the ISS from the AC power source before opening the enclosure.
1.Open the switcher (see Opening and Closing the Switcher on page 64).
2.Locate the firmware chips to be replaced on the main or front panel circuit board (see figure 50).
3.After you are electrically grounded, use a DIP chip puller to grasp each IC chip and pull it out of the sockets.
ISM 482 Integrated Scaling Matrix Switcher • Maintenance and Modifications | 66 |