![](/images/new-backgrounds/1312344/31234483x1.webp)
Rack installation/removal of server | Hardware installation |
–You must ensure that the safety mechanisms on the server, e.g. stoppers or retaining systems, are functioning correctly.
–The shape of the rack support uprights must ensure that the rails can be bolted to the front.
–Frontally bolted telescopic rails or sliding rails.
The rails have a linear alignment feature to ensure that they can be adjusted to different rack depths.
–No support of the cable management (delivered with the mounting kit).
–Climatic conditions.
An unobstructed air intake in the rack front and air discharge in the rear cover of the rack are essential for ventilation of the installed server.
In principle the ventilation concept envisages that the necessary cooling is achieved by the horizontal
–Power supply:
For installation in 3rd party racks, you must ensure that the appropriate socket strips are present.
42 | Operating manual | RX600 S4 |