Furuno 16 Results of PV test, Interpreting the PV test results display, Test Date & Time, Bber

Models: 16

1 187
Download 187 pages 48.57 Kb
Page 156
Image 156
7.3.3Results of PV test

7. MAINTENANCE, TROUBLESHOOTING

7.3.3Results of PV test

1.At the standby display, press the [F7] key to display the Options menu.

2.Press the [7] key to display the Test menu.

3.Press the [2] key to display the results of the PV test.

 

 

 

 

 

Options

 

 

 

 

 

 

 

 

 

 

 

 

 

Test

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1. Login

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. Logout

 

 

 

 

 

 

PV Test Result

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ctrl+P: Print ESC: Quit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Test Date & Time

02-02-25 01:58 (UTC)

 

 

 

 

 

Attempts

 

 

 

 

First attempt

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BBER

 

 

 

 

Pass

 

 

 

 

 

Shore-to-Ship Attempts

First attempt

 

 

 

 

 

Ship-to Shore Attempts

First attempt

 

 

 

 

 

Distress Alert

Pass (Test OK)

 

 

 

 

 

Signal strength

Pass (Greater than Std level + 10dB)

 

 

 

 

 

Overall Result

Pass (Applicable tests pass)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sample PV test results

4. To return to the standby display, press any key.

Interpreting the PV test results display

Test Date & Time:

Date and time of test

Attempts:

Number of times the PV test was conducted.

BBER:

Bulletin Board Error Rate (%). “Pass” appears for no

Shore-to-Ship Attempts:

error.

Number of tests initiated by LES.

Ship-to-Shore Attempts:

Number of tests initiated by MES.

Distress Alert:

“Pass (Test OK)” appears for successful testing.

Signal Strength:

“Pass” appears if signal strength is greater than

Overall Result:

standard level.

“Pass” appears for satisfactory completion of the

 

test.

7-6

Page 156
Image 156
Furuno 16 Results of PV test, Interpreting the PV test results display, Test Date & Time, Attempts, Bber, Distress Alert