Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

Humidifier drains

Put the humidifier in system flush

Quarterly

Qualified personnel

 

mode and inspect drain flow and

 

 

 

water supply flow. Inspect, clean,

 

 

 

and/or replace as necessary.

 

 

Inspect for any internal or external

Quarterly

Qualified personnel

 

water leaks, repair or replace

 

 

 

leaking components.

 

 

Using LLS, verify proper cylinder

Quarterly

Qualified personnel

 

operation. Inspect the cylinder for

 

 

 

blackened areas and, if present,

 

 

 

check the condition of the

 

 

 

electrodes. If necessary, replace

 

 

 

the cylinder.

 

 

Replace the cylinder.

Annually

Qualified personnel

ECS

Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

Full system functional check

Operational check of all system

Quarterly

Qualified personnel

 

components

 

 

Check and clear alarm log

Quarterly

Qualified personnel

Inspect and test ECS battery

Every 2 years

Qualified personnel

 

backup system

 

 

Electrical

Maintenance of the electrical components might require the following:

Expose personnel to high voltage.

Allow personnel to come into direct contact with high voltage.

Power down the POD during the execution of the maintenance item.

You must explicitly state and acknowledge if a POD power down will be possible. If a power down is not possible, LLS inspections will be conducted and further action will be taken at your discretion.

Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

Electrical connections

Use LLS to check for major

Quarterly

Licensed electrician

 

electrical connections (torque

 

 

 

marks, sizzle, and acrid odor):

 

 

 

Main/House Power Feeds

 

 

 

Busway End Feeds, Drop

 

 

 

 

Boxes (including cables and

 

 

 

 

cord caps)

 

 

 

Electrical panels, breakers,

 

 

 

 

and disconnects

 

 

 

480/415 VAC transformer

 

 

 

 

 

 

 

Periodic maintenance 64