Periodic maintenance

Periodic maintenance overview

Perform periodic inspections on the components in this section to be sure that the HP POD 20c continues to perform within the designed parameters.

Qualified personnel

Qualified personnel are identified as personnel who are:

•Properly trained in the operation and maintenance of the HP POD 20c

•Customer-authorized to conduct maintenance activities

Qualified personnel can be:

•HP personnel

•Agents for HP

•Site maintenance personnel

Cooling system

Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

Air filters

Inspect and replace as necessary

As needed (at

Qualified personnel

 

 

 

least quarterly)

 

Air filter differential pressure

Inspect and replace as necessary

Annually

Qualified personnel

sensor

 

 

 

 

Cooling system leak check

Verify that there is no visible

Quarterly

Qualified personnel

 

chilled water leakage from the:

 

 

 

•

Heat Exchanger

 

 

 

•

CWS piping

 

 

 

•

CWR piping

 

 

 

If a leak is detected, see "Leak

 

 

 

detection (on page 62)."

 

 

Condensate drain pans

Inspect and verify that the:

Quarterly

Qualified personnel

 

• Pans are free of debris

 

 

 

• Pans have no leaks

 

 

 

• Leakage detectors are in

 

 

 

 

proper position

 

 

 

Clean pans as necessary

 

 

Condensate drain pan sensors

Inspect, test, and replace as

Quarterly

Qualified personnel

 

necessary.

 

 

 

If a leak is detected, see "Leak

 

 

 

detection (on page 62)."

 

 

Periodic maintenance 61