Component to be inspected

Task

Frequency

Capable Party

 

 

 

 

POD SHUT DOWN REQUIRED

Annually

Licensed electrician

 

Conduct torque checks on the

 

 

 

following:

 

 

 

Main/House Power Feeds

 

 

 

Electrical panels, breakers,

 

 

 

 

and disconnects

 

 

 

Busway End Feeds and Drop

 

 

 

 

Box locking mechanism (bolt)

 

 

 

 

 

 

Grounding

Grounding system residence test

Every 2 years

Licensed electrician

 

using the DUCTOR method

 

 

POD SHUT DOWN REQUIRED

Every 2 years

Licensed electrician

 

Ground and grounding

 

 

 

connection/lug located internal to

 

 

 

each electrical panel torque test.

 

 

 

Clean and re-tighten as necessary.

 

 

Service entrance grounding

Every 2 years

Licensed electrician

 

ground-rod/ground well and

 

 

 

grounding connection/lug located

 

 

 

external to the POD torque test.

 

 

 

Clean and re-tighten as necessary.

 

 

POD SHUT DOWN REQUIRED

Every 2 years

Licensed electrician

 

Service entrance ground

 

 

 

connection/lug located on the

 

 

 

switchboard (or landing location)

 

 

 

torque test. Clean and re-tighten as

 

 

 

necessary.

 

 

Grounding system bonding

Every 2 years

Licensed electrician

 

jumpers that connect racks to the

 

 

 

POD structure and rack to rack

 

 

 

torque test. Clean and re-tighten as

 

 

 

necessary.

 

 

Circuit breakers

Panel breaker operational test

Annually

Licensed

 

(open and shut).

 

electrician/Qualified

 

 

 

 

personnel

 

 

 

 

LLS inspection of breakers,

Quarterly

Licensed

 

disconnects, motor starters, and

 

electrician/Qualified

 

fuse holders (physical).

 

personnel

 

 

 

 

Breaker fault testing for all

Every 3 years

Third party testing

 

breakers ≥ 250AF

 

facility

 

 

 

 

Sensors

Verify proper operation of:

Annually

Qualified personnel

 

Internal POD temperature

 

 

 

 

sensors (thermometer)

 

 

 

Relative humidity sensors (RH

 

 

 

 

meter)

 

 

 

(Investigate discrepancies, trouble

 

 

 

shoot, and replace as necessary.)

 

 

Periodic maintenance 65