IBM 9117-MMB, 9179-MHB manual v Always lower the leveling pads on the rack cabinet, R001

Models: 9117-MMB 9179-MHB

1 120
Download 120 pages 7.28 Kb
Page 47
Image 47
To do this, go to the following Web site: IBM Prerequisite

Observe the following precautions when working on or around your IT rack system:

vHeavy equipment–personal injury or equipment damage might result if mishandled.

vAlways lower the leveling pads on the rack cabinet.

vAlways install stabilizer brackets on the rack cabinet.

vTo avoid hazardous conditions due to uneven mechanical loading, always install the heaviest devices in the bottom of the rack cabinet. Always install servers and optional devices starting from the bottom of the rack cabinet.

vRack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices.

vEach rack cabinet might have more than one power cord. Be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing.

vConnect all devices installed in a rack cabinet to power devices installed in the same rack cabinet. Do not plug a power cord from a device installed in one rack cabinet into a power device installed in a different rack cabinet.

vAn electrical outlet that is not correctly wired could place hazardous voltage on the metal parts of the system or the devices that attach to the system. It is the responsibility of the customer to ensure that the outlet is correctly wired and grounded to prevent an electrical shock.

CAUTION

vDo not install a unit in a rack where the internal rack ambient temperatures will exceed the manufacturer's recommended ambient temperature for all your rack-mounted devices.

vDo not install a unit in a rack where the air flow is compromised. Ensure that air flow is not blocked or reduced on any side, front, or back of a unit used for air flow through the unit.

vConsideration should be given to the connection of the equipment to the supply circuit so that overloading of the circuits does not compromise the supply wiring or overcurrent protection. To provide the correct power connection to a rack, refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply circuit.

v(For sliding drawers.) Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack. Do not pull out more than one drawer at a time. The rack might become unstable if you pull out more than one drawer at a time.

v(For fixed drawers.) This drawer is a fixed drawer and must not be moved for servicing unless specified by the manufacturer. Attempting to move the drawer partially or completely out of the rack might cause the rack to become unstable or cause the drawer to fall out of the rack.

(R001)

Before you begin a replacement or installation procedure, perform these tasks:

1.If you are installing a new feature, ensure that you have the software required to support the new feature.

To do this, go to the following Web site: IBM Prerequisite

2.If you are performing an installation or replacement procedure that might put your data at risk, ensure, wherever possible, that you have a current backup of your system or logical partition (including operating systems, licensed programs, and data).

3.Review the installation or replacement procedure for the feature or part.

4.Note the significance of color on your system.

Power supplies 35

Page 47
Image 47
IBM 9117-MMB, 9179-MHB manual v Always lower the leveling pads on the rack cabinet, R001