IBM 9117-MMB, 9179-MHB manual Verifying a repair using an IBM i system or logical partition

Models: 9117-MMB 9179-MHB

1 120
Download 120 pages 7.28 Kb
Page 89
Image 89
Verifying a repair using an IBM i system or logical partition

1.From the RESOURCE REPAIR ACTION menu, select the parent or child of the resource that has been replaced. If the repair action was reseating a cable or adapter, select the resource associated with that repair action. If the resource associated with your action is not displayed on the resource list, select sysplanar0.

2.Press COMMIT after you make your selections.

3.If the No Trouble Found menu displays, continue with the next step.

11.If you changed the service processor or network settings, as instructed in previous MAPs, restore the settings to the value they had prior to servicing the system. If you ran stand-alone diagnostics from CD-ROM, remove the stand-alone diagnostics CD-ROM from the system.

Did you perform service on a RAID subsystem involving changing of the PCI RAID adapter cache card or changing the configuration?

Note: This information does not apply to the PCI-X RAID adapter or cache.

No Go to the close of call procedure.

Yes Continue with the next step.

12.Use the Recover Options selection to resolve the RAID configuration. To do this, perform the following steps:

1.On the PCI SCSI Disk Array Manager display, select Recovery options.

2.If a previous configuration exists on the replacement adapter, this must be cleared. Select Clear PCI SCSI Adapter Configuration and press F3.

3.On the Recovery Options screen, select Resolve PCI SCSI RAID Adapter Configuration.

4.On the Resolve PCI SCSI RAID Adapter Configuration screen, select Accept Configuration on Drives.

5.On the PCI SCSI RAID Adapter selections menu, select the adapter that you changed.

6.On the next screen, press Enter.

7.When you see the Are You Sure selection menu, press Enter to continue.

8.If you see a Failed status message, verify that you selected the correct adapter, and then repeat this procedure. When the recovery is complete, exit the operating system.

9.Go to the close of call procedure.

Verifying a repair using an IBM i system or logical partition

Use this procedure to verify a repair using the IBM i operating system.

1.Was the system powered off during the repair? Yes: Continue with the next step.

No: Continue with step 3.

2.Perform the following tasks:

a.Verify that the power cable is plugged into the power outlet.

b.Verify that power is available at the customer's power outlet.

3.Was the partition powered off during the repair?

Power supplies 77

Page 89
Image 89
IBM 9117-MMB, 9179-MHB manual Verifying a repair using an IBM i system or logical partition