IBM 9117-MMB, 9179-MHB manual Verifying a repair, Did all the enclosures power on?

Models: 9117-MMB 9179-MHB

1 120
Download 120 pages 7.28 Kb
Page 85
Image 85
Verifying a repair

a.From the Resource Repair Action menu, select the parent or child of the resource that has been replaced. If the repair action was to reseat a cable or adapter, select the resource associated with that repair action. If the resource associated with your action does not appear on the Resource List, select sysplanar0. Press Enter.

b.Select Commit after you make your selections.

c.If the No Trouble Found display appears, go to step 9.

9.If you changed the service processor or network settings, as instructed in previous procedures, restore the settings to the values they had prior to servicing the system.

10.Did you do any hot-plug procedures before doing this procedure?

No: Go to step 11.

Yes: Go to step 12.

11.Start the operating system, with the system or logical partition in normal mode. Were you able to start the operating system?

No: Contact your service provider. This ends the procedure.

Yes: Go to step 12.

12.Are the indicator lights still on? v No. This ends the procedure.

vYes. Turn off the lights. See one of the following for instructions: Changing service indicators

Verifying a repair

Use these procedures to verify hardware operation after making repairs to the system.

Choose from the following options:

vTo verify the repair of a system that is currently powered off, go to step 1.

vTo verify the repair of a system that is currently powered on with no operating system loaded, go to step 3.

vTo verify the repair of a system that is currently powered on and that has an operating system loaded, go to step 5 on page 74.

1.Power on the server and all attached I/O enclosures.

Did all the enclosures power on?

Yes: Go to step 3.↓ Go to step 3.

No: Continue with the next step.

2.Choose from the following options:

vIf the original problem was that an enclosure would not power on and you have another FRU to replace, locate and replace the next field-replaceable unit (FRU).

vIf the next FRU in the FRU list is an isolation procedure, perform the isolation procedure.

vIf the original problem was that an enclosure would not power on and you have an isolation procedure to complete, perform the isolation procedure.

vIf the original problem was that an enclosure would not power on and there are no more FRUs or isolation procedures in the FRU list, contact your next level of support.

vIf you have a new problem, perform problem analysis and repair the new problem.

3.Load the operating system.

Did the operating system load successfully?

Yes: Go to step 5 on page 74.

No: Continue with the next step.

Power supplies 73

Page 85
Image 85