Power Systems
Power supplies for the 9117-MMB or 9179-MHB
Page
Power Systems
Power supplies for the 9117-MMB or 9179-MHB
Copyright IBM Corporation 2010
Power supplies for the 9117-MMB or 9179-MHB
Contents
Safety notices
Notices
Laser safety information
Safety notices
World Trade safety information
German safety information
3. Attach the signal cables to the connectors
v Do not open or service any power supply assembly
2. Remove the power cords from the outlets
3. Remove the signal cables from the connectors
R001
v Always install stabilizer brackets on the rack cabinet
v Always lower the leveling pads on the rack cabinet
v Do not use a ramp inclined at more than 10 degrees
Install stabilizer brackets on the rack cabinet
Remove all devices in the 32U position and above
v Verify that all door openings are at least 760 x 230 mm 30 x 80 in
C026
L003
The equipment is suitable for installation in the following
L003
Power supplies for the 9117-MMB or 9179-MHB
Whats new in Power supplies
March
2 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 1. Removing the power supply
Power supplies
Related information
Related information
Figure 2. Removing the power supply
4 Power Systems Power supplies for the 9117-MMB or 9179-MHB
3. Connect the power cable A to the power supply
Related information
6 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 5. Replacing the power supply
Related information
Power supply LEDs
Determine if you are able to perform this procedure concurrently
6. Attach the wrist strap
Power supplies
Figure 9. Removing a power supply
Figure 11. Removing a fan
Figure 10. Fan fault LED and fan identify button
12 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Related information
Figure 12. FRU fault and identify LED
14 Power Systems Power supplies for the 9117-MMB or 9179-MHB
B, shown in Figure 15, is on solid
Related information
Figure 16. Removing a power supply fan
16 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Determine if you are able to perform this procedure concurrently
Figure 17. Replacing a fan
Figure 18. Replacing a power supply
18 Power Systems Power supplies for the 9117-MMB or 9179-MHB
8. Reconnect the power cable A to the front of the power supply, and then slide the cable retention bracket B to the closed position to secure the cable as shown in Figure 19. By moving the bracket to the closed position, you turn on the power supply
11. Close the front rack door
Related information
Figure 22. Replacing a fan
22 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 23. Replacing a power supply
24 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 25. Expansion unit ac power and OCA power LEDs
Related information
Figure 26. Fan fault LED
26 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 29. Removing an input power distribution assembly
Figure 28. Removing an input power distribution assembly cover
Related information
28 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 31. Replacing an input power distribution assembly cover
Figure 30. Replacing an input power distribution assembly
Related information
30 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 33. Replacing an input power distribution assembly
32 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 34. Replacing an input power distribution assembly cover
Related information
Common procedures for installable features
Before you begin
3. Attach the signal cables to the connectors
v Do not open or service any power supply assembly
2. Remove the power cords from the outlets
3. Remove the signal cables from the connectors
To do this, go to the following Web site IBM Prerequisite
v Always install stabilizer brackets on the rack cabinet
v Always lower the leveling pads on the rack cabinet
R001
Control panel LEDs
Identifying a part
Figure 36. Control panel
Identifying a failing part in an AIX system or logical partition
4. Select Display Previous Diagnostic Results and press Enter
Activating the indicator light for the failing part
Deactivating the failing-part indicator light
Deactivating the failing-part indicator light
Activating the failing-part indicator light
1. Sign on to an IBM i session, with at least service level authority
Identifying a failing part in an IBM i system or logical partition
Related information
Identifying a failing part in a Linux system or logical partition
Locating a failing part in a Linux system or logical partition
40 Power Systems Power supplies for the 9117-MMB or 9179-MHB
4. Select Display Previous Diagnostic Results and press Enter
Identifying a part by using the Virtual I/O Server
Activating the indicator light for the failing part
Deactivating the failing-part indicator light
Starting a system that is not managed by an HMC or an SDMC
Starting the system or logical partition
Page
Stopping a system that is not managed by an HMC or an SDMC
Stopping a system or logical partition
L003
Stopping a system by using the Hardware Management Console
Related information
2. From the Actions menu, select Operations → Power Off
Stopping a system with the Systems Director Management Console
46 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 38. Placing the system in the service position
4. Close the front rack door of the unit you are servicing
Figure 40. Placing the system into the operating position
Removing and replacing covers for the 8202-E4B or 8205-E6B
Figure 41. Removing the front cover
Removing the front cover on a stand-alone 8202-E4B or 8205-E6B system
Figure 42. Removing the front cover
Figure 43. Removing the front cover
52 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Use this procedure to remove the service access cover
54 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 46. Removing the service access cover
Power supplies
Figure 47. Installing the outside service access cover
Figure 48. Removing the inside service access cover
56 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Figure 49. Installing the service access cover
5. Place the outside service access cover A on top of the system
Figure 51. Installing the outside service access cover
Disconnecting the power cords from the 8202-E4B or 8205-E6B system
Power supplies
Figure 52. Removing the power cords for a rack-mounted system
Figure 53. Removing the power cords for a stand-alone system
3. In the Tasks area expand Serviceability → Hardware → MES Tasks
Connecting the power cords to the 8202-E4B or 8205-E6B system
Installing a feature by using the Hardware Management Console
3. Select Advanced Diagnostics Routines and press Enter
Installing a part by using the Systems Director Management Console
Verifying the installed part
Did the Resource Repair Action menu appear? No Go to step
6. Did the Testing Complete, No trouble was found message appear?
v No. This ends the procedure
1. Sign on to an IBM i session, with at least service level authority
Verifying the installed part in an IBM i system or logical partition
2. Sign on with at least service level authority
Deactivating the failing-part indicator light
7. At the Diagnostic Operating Instructions display, press Enter
Verifying the installed part in a Linux system or logical partition
Verifying an installed part by using stand-alone diagnostics
66 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Verifying the installed part by using Hardware Management Console
4. Select Tasks, then Operations, and then Manage Attention LED
Activating and deactivating LEDs by using the HMC
6. Click Close Event
Deactivating a system attention LED or partition LED
68 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Viewing serviceable events by using the HMC
2. Select Manage Serviceable Events
a. Select Actions → View Comments
Deactivating a system attention LED or partition LED
Activating and deactivating LEDs by using the SDMC
6. Click Delete or Ignore
70 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Activating or deactivating identify LED by using the SDMC
2. Select Actions → Service and Support → Hardware → Identify LED
2. Select Actions → System Status and Health → Event Log
3. Select Advanced Diagnostics Routines and press Enter
Did the Resource Repair Action menu appear? No Go to step
6. Did the Testing Complete, No trouble was found message appear?
72 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Did the operating system load successfully?
Verifying a repair
Did all the enclosures power on?
Verifying the repair in AIX
7. Perform the following steps
3. Select the Diagnostics Routines option
Perform the following steps
Did another Resource Repair Action 801015 display? No Yes
76 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Verifying a repair using an IBM i system or logical partition
78 Power Systems Power supplies for the 9117-MMB or 9179-MHB
procedure
Select the function key for Include nonreporting resources
Verifying the repair in Linux
Verifying the repair from the management console
v No Go to Detecting problems. This ends the procedure
Closing a service call
v No Go to the HMC isolation procedures. This ends the procedure
3. Are there any service action events that are open?
82 Power Systems Power supplies for the 9117-MMB or 9179-MHB
18. Click Close Event
22. Select the No FRU Replaced for this Serviceable Event option
84 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Closing a service call using AIX or Linux
Did you encounter any problems?
9. Complete the following steps
88 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Closing a service call using Integrated Virtualization Manager
90 Power Systems Power supplies for the 9117-MMB or 9179-MHB
18. Click Close Event
24. Is the error class recorded in step 23 on page 91?
Activating and deactivating LEDs
94 Power Systems Power supplies for the 9117-MMB or 9179-MHB
2. Click Actions Service and Support Hardware System Attention LED
3. Open Operations 4. Open LED Status
2. Click Actions Service and Support Hardware Identify LED
96 Power Systems Power supplies for the 9117-MMB or 9179-MHB
5. Click Save settings
Notices
Ethernet connection usage restriction
Trademarks
Electronic emission notices
Class A Notices
VCCI Statement - Japan
Industry Canada Compliance Statement
Avis de conformité à la réglementation dIndustrie Canada
European Community Compliance Statement
Electromagnetic Interference EMI Statement - Peoples Republic of China
Electromagnetic Interference EMI Statement - Taiwan
Germany Compliance Statement
Electromagnetic Interference EMI Statement - Korea
Federal Communications Commission FCC statement
Class B Notices
Electromagnetic Interference EMI Statement - Russia
VCCI Statement - Japan
Industry Canada Compliance Statement
Avis de conformité à la réglementation dIndustrie Canada
European Community Compliance Statement
Germany Compliance Statement
IBM Taiwan Contact Information
104 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Electromagnetic Interference EMI Statement - Korea
Terms and conditions
106 Power Systems Power supplies for the 9117-MMB or 9179-MHB
Page
Printed in USA