Closing the blade server cover

1.Review the safety information beginning on page 109 and “Installation guidelines” on page 33.

2.Connect the control-panel cable to the control-panel connector on the processor board.

Control-panel connector

Control-panel cable

3.Insert the tabs on the bottom of the bezel up into the matching holes on the server chassis; then, rotate the top of the bezel toward the server until the tabs at the top of the bezel snap into place.

Closing the blade server cover

Important: The blade server cannot be inserted into the BladeCenter unit until the cover is installed and closed or a SCSI storage expansion unit is installed. Do not attempt to override this protection.

Chapter 4. Installing options 63

Page 73
Image 73
IBM HS40 manual Closing the blade server cover, Control-panel connector Control-panel cable, Installing options