IBM MaxLoader manual Config / Concurrent gang mode, Config / Hardware test

Models: MaxLoader

1 118
Download 118 pages 6.46 Kb
Page 92
Image 92

MaxLoader User’s Guide

Inc Value: This value will be added to the previous data value

User must click on Auto Increment to program a memory with data increased by one to the previous data.

Config / Hardware test

A hardware test is designed to assist customers in confirming and diagnosing problems relating to all programmers. If a hardware defect with a programmer is suspected, we recommend the users to run this test in order to confirm whether or not a problem has occurred with the programmer.

Config / Concurrent (gang) mode

Since the technology for USB allows to make a hub port available in a PC, we introduce multiple socket programmers, ProMax (4G, 8G), also multiple single- socked programmers can be operated as GANG PROGRAM MODE while the same model are connected in a USB hub(4 or 8) . With the Start key in USB

programmer, a programmer command stream such as Erase/Blank/Program/Verify/Security can be executed without PC software

92

Page 92
Image 92
IBM MaxLoader manual Config / Concurrent gang mode, Config / Hardware test