Lincoln Electric SVM133-B service manual Clamping Procedure For 1/4-28 CAP Screws

Models: SVM133-B

1 197
Download 197 pages 45.78 Kb
Page 153
Image 153

Section TOC

Master TOC

F-99

F-99

TROUBLESHOOTING & REPAIR

SCR REMOVAL AND REPLACEMENT (continued)

Return to

Return to Section TOC

Return to Section TOC

Return to

Return to Master TOC

Return to Master TOC

CLAMPING PROCEDURE

FOR 1/4-28 CAP SCREWS

NOTE: This procedure can only be used with 1/4- 28 cap screws.

Do not use cap screws with any other type thread or new SCR will be damaged.

Do not over tighten cap screws. The leaf spring will apply the required clamping force to the SCR.

1.Do not turn the nuts. While holding the nuts stationary, turn the cap screws only with the following procedure.

2.Tighten first cap screw 1/4 turn.

3.Tighten second cap screw 1/2 turn.

4.Tighten first cap screw 1/2 turn.

5.Tighten second cap screw 1/2 turn.

6.Tighten first cap screw 1/4 turn. STOP.

7.Assembly now has the proper clamping force.

8.Perform the Active SCR Test.

CLAMPING PROCEDURE

FOR 1/4-20 CAP SCREWS

NOTE: This procedure can only be used with 1/4-20 cap screws.

Do not use cap screws with any other type thread or new SCR will be damaged.

Do not over tighten cap screws. The leaf spring will apply the required clamping force to the SCR.

1.Do not turn the nuts. While holding the nuts stationary, turn the cap screws only with the following procedure.

2.Tighten first cap screw 1/4 turn.

3.Tighten second cap screw 1/2 turn.

4.Tighten first cap screw 1/2 turn.

5.Tighten second cap screw 1/2 turn.

6.Tighten first cap screw 1/4 turn. STOP.

7.Assembly now has the proper clamping force.

8.Perform the Active SCR Test.

Return to Section TOC

Return to Master TOC

COMMANDER 400

Page 153
Image 153
Lincoln Electric SVM133-B service manual Clamping Procedure For 1/4-28 CAP Screws, Clamping Procedure For 1/4-20 CAP Screws