Getting Started

Hardware Preparation and Installation

 

 

Figure 2-2 CPCI-6115 Thermally Significant Components (Secondary Side)

U101

U89

U102 U96

2.4Getting Started

This section provides an overview of the steps necessary to install and power up the CPCI- 6115, any additional equipment requirements, and a brief section on unpacking and ESD precautions. As identified in the following table, several steps can be omitted if your board has been shipped with PMCs already installed.

2.4.1Overview of Start-up Procedure

The following table lists the things you will need to do before you can use this board and tells where to find the information you need to perform each step. Be sure to read this entire chapter, including all Caution and Warning notes, before you begin.

Table 2-4 Startup Overview

 

Task

Section or Manual Reference

Page

 

 

 

 

 

Unpack the hardware

Unpacking and Inspecting the Board

37

 

 

 

 

 

Configure the hardware by setting jumpers

Setting Switches and Jumpers (CPCI-6115)

37

 

on the baseboard and transition module.

Jumper Settings (CPCI-6115-MCPTM)

126

 

 

 

 

 

 

 

 

CPCI-6115 CompactPCI Single Board Computer Installation and Use (6806800A68D)

35

Page 37
Image 37
Motorola CPCI-6115 manual Getting Started, Overview of Start-up Procedure, Startup Overview