Architecture

Property Management System - Communication Interface

Cabling Considerations

When the PMS is connected to the NEAX through a modem, the cables should just be “straight through” cables. There should be no crossing.

When the PMS is directly connected to the NEAX, use the following pin assignments:

NEAX

 

 

 

 

 

Pin No.

Signal

 

 

Cable

1

FG

 

 

 

 

 

2

SD

 

 

 

 

 

 

 

 

 

 

3

RD

 

 

 

 

 

 

 

 

 

 

4

RS

 

 

 

 

 

 

 

 

 

 

5

CS

 

 

 

 

 

 

 

 

 

 

6

DR

 

 

 

 

 

7SG

8CD

15

ST2

17

RT

20ER

24ST1

 

PMS

Signal

Pin No.

FG

1

SD

2

RD

3

RS

4

CS

5

DR

6

SG

7

CD

8

ST2

15

RT

17

ER

20

ST1

24

Figure 2-7 Direct Connection Pin Assignments

Page 18

NDA-30115 Revision 1.0

Page 28
Image 28
NEC NDA-30115-001 manual Cabling Considerations, Pin No Signal Cable 20 ER 24 ST1, ST2 ST1