Commissioning

83(86)

10Connect the motor to the process (if the startup test was run without the motor being connected)

a)Before running the tests, make sure that this can be done safely.

b)Inform co-workers of the tests.

c)Repeat test 8A or 8B.

8

Page 83
Image 83
Nx Networks NX series user manual 8386