6.Align the verifier so the verifier’s beam is centered in the feed path. See “Setup” for beam positioning. Securely tighten ALL the set screws.

7.A cable tube is provided with each verifier to hide the cables from view. Slightly open the cable tube and slide the cables through it. Hold the cable tube against the vertical stand’s shaft and secure the cable tube to the shaft with the cable ties.

Secure cable ties here

2-10Operating Instructions