Polycom DOC2231A manual To change the duration of an On Going Conference

Models: DOC2231A

1 116
Download 116 pages 3.93 Kb
Page 75
Image 75

Chapter 5 - Basic Operations

To change the duration of an On Going Conference:

1.In the Browser, Monitor or Status panes, right-click the conference icon, and then click Properties.

The Conference Properties dialog box opens.

2.Click the Scheduler tab.

3.Modify the conference Ending Time.

5-23

Page 75
Image 75
Polycom DOC2231A manual To change the duration of an On Going Conference, Conference Properties dialog box opens