46 | ST1000 Plus & ST2000 Plus Tiller Pilots - Owner’s Handbook |
4.Remove the template.
5.Pass the power cable and any other cables (SeaTalk and NMEA) through the bulkhead and the gasket.
6.Use a small
7.Assemble the rubber cap to one of the 4
8.Secure the socket to the bulkhead using the 4
9.Secure the cable(s) at regular intervals using suitable clips.
10.Assemble the plug to the socket by screwing the ‘floating’ nut onto the threaded part of the socket by hand.
11.The retaining ring is designed as a stop for the plug nut to prevent accidental disassembly. After you have tightened the floating nut, slide the retaining ring back up the plug to retain the nut.
Power supply
4 Installing the Tiller Pilot
| Supply (0 V) | Socket |
12 A fuse | Supply (+12 V DC) | |
|
|