Automation and Drives - SCE

Starting Up the Software PID Controller (S)FB41 "CONT_C" with STEP 7

A SIMATIC S7-300 is programmed as a PID controller with the software STEP 7. This provides the user with a uniform configuring tool for central as well as distributed configurations. Here, only the most essential aspects can be pointed out. (Additional information is provided in the STEP7 reference manuals.)

The PID controller is parameterized with a special application included in STEP7 -Assigning parameters to a PID Control- by resetting values there in an instance DB associated with the (S)FB

41.This is done as follows:

4.3Exercise Example

The user has to perform the steps below in order to configure the hardware as well as to generate an

S7 program with the functionality of a PID controller, and then load it to a PLC:

1.Call the SIMATIC Manager

Click on symbol 'SIMATIC Manager’

2.Set up new project ( → File → New)

Click on 'New'

 

 

 

 

 

 

 

 

Preface Fundamentals

Discontinuous Action Controllerr

Controller Block (S)FB41

 

Setting the System Appendix

 

 

 

 

 

 

 

 

 

T I A Training Document

Page 40 of 64

Module

 

 

 

 

 

B3

Issued: 02/2008

 

 

 

Control Engineering with STEP 7

Page 40
Image 40
Siemens Module B3 manual Exercise Example