Sony C9000 service manual Operation at Power-on

Models: C9000

1 157
Download 157 pages 36.51 Kb
Page 38
Image 38

2.12 Operation at Power-on

2.12.1Self-diagnostic test

(1)Initial test

The following checks are automatically performed at power-on.

(a)ROM check

(b)RAM check

(c)EEPROM check

(d)Flash ROM check

(2)ROM check

The ROM is checked by calculating a HASH value.

(3)RAM check

(a)Checking is conducted by RAM type. Out-of-specification RAM is judged as an error.

(b)The order of mounted RAMs is checked. Out-of-standard RAM is judged as an error.

(c)The RAM in each slot is checked by read-after-write operation.

(4)EEPROM Check

Specific data stored at the fixed EEPROM address is checked.

(5)Flash ROM Check

The flash ROM format is checked. Unformatted ROM is formatted after the read-after-write checking.

(6)Option Unit Check

Checking whether the option units (including a HDD, NIC, option trays and the duplex unit) are equipped with the printer is performed.

41388601TH Rev.2

38 /

Page 38
Image 38
Sony C9000 service manual Operation at Power-on