AFR E100/S90/S120 FORK OWNER’S MANUAL EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
15130 Concord Circle, Morgan Hill, CA 95037 408
DEUTSCH
ENGLISH
FRANÇAIS
ITALIANO
INSTALLATION
CONTENTS
MAINTENANCE
WARRANTY
INTRODUCTION
SERVICE AND MODIFICATIONS
FRA ITA DEU NLD
MAINTENANCE
WARRANTY
TERMINOLOGY
INSTALLATION
PRE-INSTALLING THE FORK
PREPARING THE COMPONENTS
PRT ESP JPN
INSTALLING THE FORK
Fork install steps continued on next page
ITA DEU NLD
SHOCK PUMP
DEU NLD
SETUP
SETTING AIR PRESSURE AND SAG
ADJUSTING REBOUND
Brain Fade, which helps control cornering and braking
ADJUSTING COMPRESSION BRAIN FADE
The blue knob bottom of right leg adjusts compression
Turn the knob counter-clockwise for a softer, suppler setting
Page
15130 Concord Circle, Morgan Hill, CA 95037 408
MANUEL DU PROPRIÉTAIRE DE LA FOURCHES AFR E100/S90/S120
EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
GARANTIE
TABLE DES MATIERES
TERMINOLOGIE DE L’AMORTISSEUR
ENTRETIEN GÉNÉRAL
INTRODUCTION
SERVICE ET MODIFICATIONS
ITA DEU NLD PRT ESP JPN
TERMINOLOGIE DE L’AMORTISSEUR
ENTRETIEN GÉNÉRAL
OUTILS NÉCESSAIRES
INSTALLATION
PRE INSTALLATION DE LA FOURCHE
GARANTIE
PREPARATION DES ELEMENTS
COUPER LE PIVOT DE FOURCHE
INSTALLER LA FOURCHE
de serrage recommandé est de 11.3 N-m
ITA DEU NLD PRT ESP
A
POMPE POUR AMORTISSEUR
SETTING AIR PRESSURE AND SAG
REGLAGE
NLD PRT ESP JPN
REGLER LA DETENTE
AJUSTEMENT DE LA COMPRESSION BRAIN FADE
Page
15130 Concord Circle, Morgan Hill, CA 95037 408
MANUALE D’USO E MANUTENZIONE FORCELLA SPECIALIZED AFR E100/S90/S120
EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
SOMMARIO
USA FRA
DEU NLD PRT ESP JPN
INSTALLAZIONE
MANUTENZIONE ORDINARIA E MODIFICHE
INTRODUZIONE
USA FRA
TERMINOLOGIA
ORDINARIA MANUTENZIONE
ATTREZZI NECESSARI
INSTALLAZIONE
PREPARAZIONE DEI COMPONENTI PRE-INSTALLAZIONE
GARANZIA
DEU NLD
PRE INSTALLAZIONE DELLA FORCELLA
TAGLIO DEL TUBO STERZO DELLA FORCELLA
USA FRA
1. Installare il tappo expander da 48mm Fig.2. Utilizzare una coppia di serraggio di 100 in-lbf 11.3 N-m
INSTALLAZIONE DELLA FORCELLA
POMPA DI GONFIAGGIO
NLD PRT
USA FRA
TARATURA DELLO SMORZAMENTO IN COMPRESSIONE BRAIN FADE
TARATURA
IMPOSTAZIONE DEL VALORE DELLA PRESSIONE DELLA MOLLA AD ARIA E DEL SAG
TARATURA DELLO SMORZAMENTO IN ESTENSIONE REBOUND
Page
AFR E100/S90/S120 BEDIENUNGSANLEITUNG EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
15130 Concord Circle, Morgan Hill, CA 95037 408
BEGRIFFSERKLÄRUNGEN
WARTUNG UND SERVICE
INHALT
EINFÜHRUNG
EINFÜHRUNG
SERVICE / TECHNISCHE MODIFIKATIONEN
BENÖTIGTE WERKZEUGE
WARTUNG UND SERVICE
BEGRIFFSERKLÄRUNGEN
NLD PRT ESP
EINBAU DER GABEL
VORBEREITEN DER BAUTEILE
GARANTIE
NLD PRT ESP JPN
VORBEREITEN DER GABEL
ABLÄNGEN DES GABELSCHAFTROHRS
USA FRA ITA
4. Montieren Sie die Scheibenbremse und die Führung für die
EINBAUEN DER GABEL
FEDERGABEL-PUMPE
USA FRA ITA
PRT ESP JPN
LUFTDRUCK UND NEGATIVFEDERWEG
EINSTELLEN DER FEDERGABEL
NLD PRT ESP JPN
ZUGSTUFENDÄMPFUNG
DRUCKSTUFENDÄMPFUNG BRAIN FADE
USA FRA ITA
15130 Concord Circle, Morgan Hill, CA 95037 408
AFR E100/S90/S120 VORK GEBRUIKERSHANDLEIDING
EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
TERMINOLOGIE
INSTALLATIE
INHOUDSOPGAVE
INLEIDING
ONDERHOUD EN AANPASSINGEN
INLEIDING
PRT ESP JPN
TERMINOLOGIE
ONDERHOUD
USA FRA ITA DEU
GARANTIE
INSTALLATIE
DE VORK VOORINSTALLEREN
DE ONDERDELEN VOORBEREIDEN
2. Omwikkel de zone waar u van plan bent om te gaan zagen met
DE VORKPIJP INKORTEN
USA FRA ITA DEU
PRT ESP JPN
DE VORK INSTALLEREN
DE LUCHTDRUK EN SAG INSTELLEN
DEMPERPOMP
VORKINSTELLING
PRT ESP
BRAIN FADE INSTELLEN
REBOUND INSTELLEN
Page
15130 Concord Circle, Morgan Hill, CA 95037 408
AFR E100/S90/S120 MANUAL DO UTILIZADOR DA FORQUETA
EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
MANUTENÇÃO GERAL
ÍNDICE
INTRODUÇÃO
TERMINOLOGIA
MANUTENÇÃO E MODIFICAÇÕES
INTRODUÇÃO
USA FRA ITA DEU NLD
MANUTENÇÃO GERAL
FERRAMENTAS NECESSÁRIAS
TERMINOLOGIA
PRÉ INSTALAÇÃO DA FORQUETA
GARANTIA
INSTALAÇÃO
PREPARAÇÃO DOS COMPONENTES
ESP JPN
CORTE DO TUBO DE DIRECÇÃO DA FORQUETA
USA FRA ITA
DEU NLD
pré-carga
INSTALAÇÃO DA FORQUETA
ITA DEU NLD
BOMBA DE SUSPENSÃO
AJUSTES
ESTABELECIMENTO DA PRESSÃO DO AR E SAG
AJUSTE DA RECUPERAÇÃO
ESP JPN
AJUSTE DA COMPRESSÃO BRAIN FADE
USA FRA
ITA DEU NLD
15130 Concord Circle, Morgan Hill, CA 95037 408
MANUAL DE USUARIO HORQUILLA AFR E100/S90/S120
EPIC/ERA/SAFIRE/STUMPJUMPER
SPECIALIZED BICYCLE COMPONENTS
GARANTÍA
INTRODUCCIÓN
TERMINOLOGÍA
MANTENIMIENTO
SERVICIO Y MODIFICACIONES
INTRODUCCIÓN
HERRAMIENTAS NECESARIAS
TERMINOLOGÍA
MANTENIMIENTO
GARANTÍA
INSTALACIÓN
PREPARACIÓN DE LOS COMPONENTES
PREISNTALACIÓN DE LA HORQUILLA
1. Una vez conseguida la altura de la potencia, hacer una marca en el
CORTAR EL TUBO DE DIRECCIÓN
INSTALACIÓN DE LA HORQUILLA
USA FRA ITA DEU NLD PRT
BOMBA DE AIRE
USA FRA
ITA DEU
PRESIÓN DE AIRE Y SAG
AJUSTES
AJUSTE DEL REBOTE
AJUSTE DE COMPRESIÓN BRAIN FADE
Soltando la suspensión va más activa
Page
スペシャライズド・ジャパン株式会社 東京都中野区弥生町2-4-9 ツナシマ第3ビル4F
AFR E100/S90/S120
フォークオーナーズマニュアル
EPIC/ERA/SAFIRE/STUMPJUMPER
ワランティー
はじめに
用語の解説
メンテナンス
必要な工具:
はじめに
用語の解説
ご購入ありがとうございます。素晴らしいサスペンションバイクの世界へようこそ!
FRA ITA DEU NLD PRT ESP
メンテナンス
ワランティー
取り付け
ングコラムと接する部分にあるパーツは、応力の集中を防ぐため、角を落としてください。
フォークの仮取り付け
ステアリングコラムの切断
することができるショックポンプP/N 4727-3010を発売して
ショックポンプ
FRA ITA DEU NLD PRT
Specializedでは弊社のフォークに空気を入れたり抜いたり
空気圧およびサグのセッティング
セットアップ
USA FRA ITA DEU NLD PRT ESP
Labを参照してください。
リバウンドの調整
コンプレッション(BRAIN FADE)の調整
Page
Page
Page
Bettini Sauser McCormack Reid Overend
2008 Specialized Bicycles
15130 Concord Circle Morgan Hill, CA 95037