Manuals
/
State Industries
/
Household Appliance
/
Water Heater
State Industries
SUF-100-250, SUF-60-120
instruction manual
Models:
SUF-60-120
SUF-100-250
1
79
80
80
Download
80 pages
61 Kb
73
74
75
76
77
78
79
80
Troubleshooting
Install
Water Piping Diagrams
Fault And Alert Conditions
Electrical Wiring
Warranty
Dimension
Maintenance
Operational Problems
Drain Valve and Access Panels
Page 79
Image 79
79
Page 78
Page 80
Page 79
Image 79
Page 78
Page 80
Contents
Commercial gas water heaters
Table Of Contents
Approvals
Safe Installation, Use and Service
Overheated water can cause water tank explosion
General Safety Information
Precautions
Hydrogen Gas Flammable
Fire or Explosion Hazard
Installing, using or servicing Water heater
Fire and Explosion Hazard
Qualifications
Preparing For The Installation
Introduction
Abbreviations Used
Basic Operation
Features And Components
Top Views 120,000 & 150,000
Water Heater’s 120 VAC on/off switch
SUF 120 & 150 Components
SUF 199 & 250 Components
Top Views
Water heaters 24 Volt Gas Valve
Left Side Right Side
Rough In Dimensions
Installation Considerations
TOP Views
Storage Capacities
Recovery Capacities
Locating The Water Heater
Gas Line Connection Size
Circulation Pumps
Extended Vent Terminations
Optional Concentric Terminations
Hard Water
Supply Gas Line
Installation Requirements
Power Supply
Gas Pressure Requirements
Thermal Expansion
Mixing Valves
Dishwashing Machines
Closed Water Systems
Water Damage Hazard
Temperature-Pressure Relief Valve
Valve Discharge Pipe Requirements
Condensate Drain Water Trap
Condensate Drain
Combustible Material Storage
Contaminated Air
Confined Space
Breathing Hazard Carbon Monoxide Gas
Air Requirements
Unconfined Space
Outdoor Air Through Two Horizontal Ducts
Fresh Air Openings For Confined Spaces
Outdoor Air Through Two Openings
Outdoor Air Through One Opening
Page
Inspection
Commonwealth of Massachusetts
General Venting Information
Venting Installation
General Venting Instructions
TEE Fitting
SUF 199 & SUF 250 Intake Air Connection
Correct Orientation
Large Hose Fernco Clamp
Venting Requirements
Power Vent Installation
Venting Installation Sequence
Direct Vent Installation
Field Supplied
Intake AIR Screen
Standard Factory Supplied Terminations
Vertical Termination Installation
Field Supplied STRAP/SUPPORT
Maximum Factory Supplied Standard Termination
Intake AIR AND/OR Vent Exhaust
Sidewall Termination Installation
Determine the location for the termination
Concentric Termination Installation
Inch Concentric Termination KIT
Inch Concentric Termination Installation
Eight Concentric Terminations
TWO Concentric Terminations
Three Concentric Terminations
Four Concentric Terminations
Sidewall Roof
Multiple Concentric Termination Arrangements
Two Concentric Terminations
Eight Concentric Terminations
Venting Arrangements
Power Vent Horizontal
Direct Vent Horizontal
Direct Vent Horizontal Vent Vertical Intake
Direct Vent Vertical Vent Horizontal Intake
Direct Vent Horizontal Concentric
Power Vent
Termination Clearances Sidewall Power Vent
Direct Vent
Termination Clearances Sidewall Direct Vent
Installation Instructions
Water Heater Installation
Condensate Drain Installation
Installation Notes
Supply Gas Line Sizing Metric Units
Supply Gas Line Installation
Gas Line Sizing
Supply Gas Line Sizing U. S. Units
Gas Line Leak Testing
Supply Gas Regulator Installation
Gas Line Connection
Connecting An External Supervisory Control
Electrical Wiring
Power Supply Connections
Enable/Disable Circuit
Thermometers not Supplied
Water Piping Diagrams
Water Line Connections
Valve Discharge Pipe
Thermostat Control
Temperature Regulation
High Temperature Limit Control ECO
High Temperature Applications
Control System Navigation
Tank Temperature 103F Operating Set Point 120F
Control System Operation
Overview
Icon Description
Status Icons
Menu Description
Operating States
State Description
Control System Menus
Description/Action Display
User Settings & Control System Menus
Update Cancel
Back Help
Change Back Help
Heater Information Description/Action Display
Display Settings Description/Action
YES
Back Advanced
View Back Help
ECO
Name
Update
Service Contact Information
Select Back Help
Prior to Start up
Start Up
Initial Start Up
Gas pressure reading while the water heater is firing
GAS Valve / Venturi Assembly TOP View
GAS Valve TOP Detail View
Lighting The Water Heater
Multiple Appliance Installations
To Turn Off Gas
High Altitude Installations
Checking The Firing Rate
1050 = 300,000 Btu/hr 87.9 kW
SUF 60 120 and SUF 100 150 Models only
Lighting The Water Heater
Lighting & Operation Labels
SUF 100 199 and SUF 100 250 Models only
Tank Temperature 103F Operating Set Point 120F
Installation Checklist
Troubleshooting
Sequence Of Operation
Closed by control system Fault Msg is displayed
Sequence Of Operation Flow Chart
Pre-Purge cycle
Momentary Ignition
Operational Problems
Installation Errors
Rough Starting, Rough Operation
Fault And Alert Conditions
Possible Causes Check/Repair Displayed Fault/Alert Message
Fault And Alert Messages
Back Advanced
No Anode Voltage
Blower Prover Failure
Draining And Flushing
Maintenance
Maintenance Schedule
General
Manual Lime Scale Removal
Filling The Water Heater
Sediment Removal
Lime Scale Removal
Vent System
Powered Anode Rods
Drain Valve and Access Panels
Temperature-Pressure Relief Valve Test
CCB Central Control Board Layout
Diagrams
J3 J5
J10 J13 J11
User Interface Modul
SUF 120 & 150 Wiring Diagram
CCB Central Control Board
SUF 199 & 250 Wiring Diagram
Circulation Pump Wiring Diagrams
Water Piping Diagrams
Temperature & Pressure
Tank Temperature ALT. Cold Water
State Storage Tank
Water Piping Diagrams
Line Temperature Control
HOT Water Outlet Pipe T&P to Open Drain Finished Floor
Limited Warranty
Top
Page
Image
Contents