Test-Um NT955 Series

ValidatorTM Setting Up the Test Tool

1.6. Calibrate

The calibration procedure is performed to set a reference point for cable length to 0 feet/meters. Once calibration is performed, the test unit retains the information. The Validator-NT does not require any other calibration. (Figure 1.7)

Note: Please disconnect all Patch Cables

Calibrate Untitled1.job

 

2005 Aug 25 Test-Um Inc.

100%

10:53:01

VALIDATOR

To calibrate the unit make sure there are no cables plugged into the unit. (Unless a patch cord is being used)

Continue

Figure 1.7 Calibrating The Unit

35

Page 36
Image 36
Test-Um NT955 operating instructions Calibrate, Calibrating The Unit