Test-Um operating instructions Test-Um NT955 Series, ValidatorTM Managing Job Files

Models: NT955

1 97
Download 97 pages 13.84 Kb
Page 52
Image 52

Test-Um NT955 Series

ValidatorTM Managing Job Files

11.When all fields have been completed, press Quit. The Auto Test screen reappears.

12.Select Cable Test Schedule. Using the alphanumeric keypad create a Test Schedule by completing the Cable ID field and selecting a Cable Type from the drop down menu. The To and From fields are optional information. The Result field is automatically populated when tests are run on that cable.

13.Proceed to Test by connecting the appropriate cable assembly.

51

Page 52
Image 52
Test-Um operating instructions Test-Um NT955 Series, ValidatorTM Managing Job Files