4.1. Cable Test Schedule

Test-Um NT955 Series

ValidatorTM How AutoTest Works

4.1. Cable Test Schedule

The Cable Test Schedule displays all the individual cable runs associated with the open job. For your convenience when testing, you can sort each field in the Cable Test Schedule in ascending or descending order. To sort the Cable Test Schedule, move the highlight to a cell in the column to be sorted and press the SORT (F4) soft key. The column is sorted first in ascending order. A second press sorts by descending order and toggles between the two on subsequent presses.

To test a cable on the list, highlight the Cable ID you wish to test. Attach that cable to the appropriate connector on the main unit. Attach the remote unit to the other end of the cable you wish to test.

With the remote connected to the cable, the test function can be started. Press TEST (See Figure 4.2). You will hear relays switching in the main unit and remote. A link is established with the remote, and Validator-NT begins testing the cable to the parameters that have been defined for its type. If it is network cable, Validator-NT will perform full Signal to Noise Ratio and Skew testing as well as Speed testing with a Bit Error Rate Test (BERT) in approximately 23 seconds.

Manual backgroundVALIDATOR-NTTMManual backgroundManual backgroundManual background

Job Manager

 

 

 

2005 Aug 25 Test-Um Inc.

Untitled1.job

100%

 

10:53:01

VALIDATOR

 

 

 

 

 

 

 

 

 

File Name

 

Modified

 

File Size

 

 

Magicworld.job

 

13.17

Tue 2005 Oct 05

 

13 K

 

 

Test-um.job

 

10.21

Wed 2005 Oct 06

 

25.1 K

 

 

Technicolor.job

 

9.51

 

Fri 2005 Oct 08

 

11.7 K

 

 

Untitled1.job

 

10.00

Mon 2005 Oct 11

 

5.7 K

 

 

 

 

 

 

 

 

 

 

OPEN

COPY

RENAME DEL JOB

ACCPT

QUIT Manual background

Manual background SEL Manual background

MENU

TESTManual background

1

2ABC

DEF

GHI 4

5JKL

MNO

PRS7

TUV

 

*Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background

Figure 4.2 Test Button

54

Page 55
Image 55
Test-Um NT955 operating instructions Cable Test Schedule