Toshiba RAS-10SK-E, RAS-10SKX, RAS-10SAX Wiring Connection, Packed Valve Handling Precautions

Models: RAS-10SA-E RAS-10SK-E RAS-10SAX RAS-10SKX

1 56
Download 56 pages 48.55 Kb
Page 30
Image 30
<Packed Valve Handling Precautions>

CAUTION

KEEP IMPORTANT 4 POINTS FOR INSTAL- LATION (PIPING WORK)

(1)Take away dust and moisture (Inside of the connecting pipes.)

(2)Tight connection (between pipes and unit)

(3)Evacuate the air in the connecting pipes using

VACUUM PUMP.

(4)Check gas leak (connected points)

<Packed Valve Handling Precautions>

Open the valve stem all the way out; so not try to open it beyond the stopper.

Securely tighten the valve stem cap with the wrench or like.

Valve stem cap tightening torque is as follows; Gas pipes side (ø9.52) : 29.4 N•m (3.0 kgf•m) Liquid pipe side (ø6.35) : 16.2 N•m (1.7 kgf•m)

<A5 mm hexagon wrench is required.>

Flare nut

Stopper

Valve body

Valve stem

Valve stem cap

Fig. 8-5-6

8-5-3. Wiring Connection

(1)Remove the electric parts cover from the outdoor unit. (1 screw)

(2)Connect the connecting cable to the terminals as identified with their respective matched numbers on the terminal block of indoor and outdoor units. (Strip the sheath of connecting cable with following stripping length to and insert into the terminal block.)

(3)When connecting the connecting cable to outdoor unit terminal, make a loop as shown in the installation diagram of indoor and outdoor unit, to prevent water coming in the outdoor unit.

(4)Insulate the unused cords (conductors) with water coming in the outdoor unit. Process them so that they do not touch any electrical or metal parts.

<Stripping length of connecting cable>

Terminal block

 

60mm

1

2

10mm Earth line

Terminal

 

screw

 

2

Screw

Earth line

1

 

 

10mm

Connecting

 

 

 

50mm

cable

Cord clamp

 

 

For a three conductor cable

Fig. 8-5-7

CAUTION

Wrong wiring connections may cause some electrical parts to burn out.

Be sure to comply with local code on running the wire from the indoor unit to outdoor unit. (size of wire and wiring method etc.)

Every wire must be connected firmly.

NOTE :

• Wipe type : More than H05 RN-F

– 30 –

Page 30
Image 30
Toshiba RAS-10SK-E, RAS-10SKX Wiring Connection, Packed Valve Handling Precautions, A5 mm hexagon wrench is required