Xantrex Technology XDI2048 manual Initial Inspection, Packing List

Models: XDI2048

1 92
Download 92 pages 28.93 Kb
Page 22
Image 22

Rack Mount Frame Assembly and Installation

Initial Inspection

When you first receive your unit, perform a quick physical check.

1.Inspect the unit for scratches and cracks, broken switches, connectors, terminals, and missing accessories.

2.Have a service technician check the unit if you suspect internal damage.

If the unit is damaged, save all packing materials and notify the carrier immediately. See instructions in “Packaging for Shipping or Storage” on page 2–3 and “Return Procedure” on page B–4.

Your purchase should ship with the following items:

 

INVERTER MODULE

RELAY RACK MOUNTING BRACKETS

 

 

SLIDING RAILS

RACK MOUNT BACKPLANE

OUTPUT STRAIN RELIEF COVER

 

 

USER MANUAL

 

 

MANUAL

Figure 2-1

Packing List

 

2-2

 

TM-DIOP-01XN-01

Page 22
Image 22
Xantrex Technology XDI2048 manual Initial Inspection, Packing List