
Chapter 9 Fault
2Choose a switch from the list located on the
3Choose a port from the list located on the
4In the Timeout field, accept the default or specify a connection timeout period (in seconds).
5Click Apply to start the loopback test.
Figure 62 Fault: Loopback Test
6A screen displays showing the test result. Click OK to close the screen.
Figure 63 fault: Loopback: Result
9.3 Ping Test
You can use the Ping screen to test connection from the selected switch to a specified IP address.
Click Fault > Ping and TraceRoute Test and click the Ping tab to display the screen.
| 103 |
NetAtlas Workgroup User’s Guide | |
|
|