GE LP11U user manual Installation, Transport Unpacking, Package Contents, Location

Page 11

g

Digital EnergyLP Series

4 - Installation

4.1Transport

NOTE: Transport the UPS only in upright position. Check for sufficient floor and elevation loading capacity. Move the UPS in its original package to the final destination room. Do not stack other package on top.

4.2Unpacking

Cut the two wrapping bands, and remove the shipping box. Loosen the four bolts with which the UPS is fixed to the pallet. Remove the UPS from the pallet.

BE CAREFUL! Pay attention to the HEAVY WEIGHT of the UPS when downloading the UPS from the pallet! Never try to lift the unit by yourself!

The UPS is equipped with castors, which allow easy displacement of the unit. Please take appropriate measures to avoid damage on vulnerable floors.

4.3Package Contents

The shipping box contains a LP-U UPS, a CD-ROM, an RS232 cable, a link (5/6kVA models only, see 4.5.3) a safety guide and this manual. If the UPS is equipped with an RPA plug-in card (Redundant Parallel Architecture, right option slot at the rear of the unit) the shipping box also contains a yellow network cable and one bus terminator. Inspect the UPS for damage after unpacking. If any damage is present please notify the carrier and place of purchase immediately.

4.4Location

Please refer to section 1.3 of ‘IMPORTANT SAFETY INSTRUCTIONS’.

4.5Installation

IMPORTANT:

Before making any connection and switching on the LP UPS, please check the following conditions:

The voltage and frequency of your utility supply is 120/208/230/240 Vac and 50 or 60 Hz; from the factory the input and output of the UPS are set to 208 Vac / 60 Hz.

Be sure that the UPS is wired for the present utility voltage. This is indicated on the packaging of the UPS, as well as at the I/O terminals.

Overcurrent protection for the AC circuit is to be provided by others.

CAUTION: To reduce risk of fire, connect only to a circuit input/output provided with branch circuit overcurrent protection in accordance with the National Electrical Code, ANSI / NFPA 70, as indicated below:

 

UPS model

Input overcurrent protection

 

Output overcurrent protection

 

 

 

(Amps)

 

 

 

 

 

 

(Max. Amps)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operating input voltage

120V

 

208V

 

240V

 

120V

 

 

120V

 

208V

 

240V

 

 

 

 

 

 

 

(1 X)

 

 

(2X)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LP 5-11U

 

35

 

30

40

 

20

 

25

 

20

 

LP 5-11U /120V

60

 

 

 

 

 

40

 

 

20

 

25

 

20

 

LP 6-11U

 

 

40

 

35

 

50

 

 

25

 

30

 

25

 

LP 6-11U /120V

70

 

 

 

 

 

50

 

 

25

 

30

 

25

 

LP 8-11U

 

 

60

 

45

 

70

 

 

35

 

40

 

35

 

LP 10-11U

 

 

70

 

60

 

80

 

 

40

 

50

 

40

Table 1. external input fuse value

LX: OPM_LPU_11U_5K0_10K_1US_V030

9

GE DE LP 11U UPS: Installation / User Manual 3.0 (US)

Image 11
Contents Digital Energy LP 11U Page Digital Energy LP Series Important Safety Instructions Interfacing Features General Important Safety InstructionsInstallation Batteries Storage Description Warranty Introduction Principles of Operation Functional ExplanationAutomatic Bypass Switch Location InstallationPackage Contents Transport UnpackingUPS model Tightening torque force Utility voltage UPS model 120V 208V 240VOutput voltage UPS model 120V 208V 240V LP 5/68/10-11U Standard installation procedure LP 5/6-11U Installation procedure 120V input Bypass tap changed to 240 Volt Bypass tap factory setting 208 VoltAvailable input voltages hardware modifications Input voltage 208 or 240VacOutput voltage 208Vac Input voltage 120Vac optional, 5/6kVA onlyAvailable output voltages hardware modifications LP 5/6/8/10-11U Output tap change Output voltage 120Vac split-phaseOutput voltage 220/230/240Vac Output voltage 120Vac single phaseOutput Voltage Setup ScreensInput Voltage Input Voltage Change toLP 5/6/8/10-11U Installation of battery pack Installation of parallel operating LP-U UPSs Autorestart OFF Press Enter Autorestart OFF Setting MismatchManual bypass MaintenanceECO-mode No-load shutdownDescription of Front and Rear Panel OperationRear panel Step-up transformer Rear panel of the step-up transformerSelftest Progress Start-upAutonomy Time Left Operating Time 0YEAR 29DAYS Battery 23CUse Input LineTemp TOO High On Line Alarm Press UPStatus and Alarm Menu Inverter OFF Battery Charger no Float Capacitor C1 Capacity LOWBattery Depleted Software Version R2.9 FAN Speed INV.DC + Service ScreensService Menu Input and Output not SynchronizedTstamp Q4 Automatic Bypass EnabledFAN Curve Language English Input Voltage Output VoltageOutput Frequency Frequency Range 2% PLL Lock Speed NormalTest Screens Automatic Bypass Enabled Service Warning DisabledQuick Battery Test Start Calibrate BAT Test Activated Deep Battery TestProcedure Utility start Other FeaturesOverload protection in bypass mode ShutdownAuto restart Superior Battery ManagementECO Auto Restart OFF Press EnterRelay Card optional Snmp Interface optional Interfacing FeaturesRS232 / contact interface Emergency shutdownRPA-Facility Redundant Parallel Architecture Optional FeaturesExtended Runtime Plug-in CardsSeismic anchors PDM Power Distribution ModuleCooling fan MaintenanceSafety Recycling the UPS at the end of service lifeSelftest Failure Q4 not OK TroubleshootingSelftest Failure Temp TOO High UPS Type 11U 10-11U SpecificationsAutomatic Bypass Switch Enclosure Center of Gravity Dimensions Conduit BoxLP 5/6/8/10-11U installation drawings LP 5/6/8/10-11U 208-240V input LP 5/6-11U 120V input