GE LP11U user manual Storage, Batteries

Page 7

g

Digital EnergyLP Series

It is important that the unit has adequate ventilation. Maintain air movement around and through the unit. Do not block the air vents.

Avoid placing the unit in direct sunlight or near heat sources.

Do not plug household appliances such as electric heaters, toasters or vacuum cleaners into the UPS. The UPS output is intended to be used only for electronic loads such as computers and telecommunications equipment.

Use insulated copper input and output wiring, rated 90°C (194° F) wire size based on the ampacities given in Tables 310-16 of the Nation Electrical code, ANSI/NFPA 70-1993. Specified in table 2 and table 3.

1.4Storage

Store the UPS with its batteries fully charged in a dry location, storage temperature must be within -20 and +45° C (-4°F and 113° F)

If the unit is stored for an extended period of time, the batteries must be recharged periodically. Connect the unit to the mains and switch it on:

-if the storage temperature is within -20 and +30°C (-4°F and 86° F), recharge the batteries every 6 months, for 24 hours,

-if the storage temperature is within -20 and +45°C (-4°F and 113° F), recharge the batteries every 4 months, for 24 hours.

1.5Batteries

NOTE: Servicing of batteries should be performed or supervised by personnel knowledgeable of batteries and the required precautions. Keep unauthorized personnel away from batteries.

When replacing the batteries, use only the same type and size battery.

Preferably for LP 5/6-11U:

Kobe HV7-12 or Panasonic LC-R127R2P

LP 8/10-11U:

Kobe HV12-12 or Panasonic LC-RA1212P

CAUTION: A battery can present a risk of electrical shock and high short circuit current. The following precautions should be observed when working on batteries:

-Remove watches, rings or other metal objects.

-Use tools with insulated handles.

-Wear rubber gloves and boots.

-Do not lay tools or metal parts on top of batteries.

-Disconnect charging source prior to connecting or disconnect battery terminals.

-Determine if the battery is inadvertently grounded. If inadvertently grounded, remove source of ground. Contact with any part of a grounded battery can result in electrical shock. The likelihood of such shock will be reduced if such grounds are removed during installation and maintenance.

Avoid charging in a sealed container.

CAUTION: Never dispose of batteries in a fire: they may explode.

CAUTION: Do not open or mutilate batteries: their contents may be extremely toxic. If exposed to electrolyte, wash immediately with plenty of water.

Proper disposal or recycling of the batteries is required. Refer to your local codes for disposal requirements.

LX: OPM_LPU_11U_5K0_10K_1US_V030

5

GE DE LP 11U UPS: Installation / User Manual 3.0 (US)

Image 7
Contents Digital Energy LP 11U Page Digital Energy LP Series Important Safety Instructions Interfacing Features Installation Important Safety InstructionsGeneral Batteries StorageIntroduction WarrantyDescription Principles of Operation Functional ExplanationAutomatic Bypass Switch Location InstallationPackage Contents Transport UnpackingOutput voltage UPS model 120V 208V 240V Utility voltage UPS model 120V 208V 240VUPS model Tightening torque force LP 5/68/10-11U Standard installation procedure LP 5/6-11U Installation procedure 120V input Bypass tap changed to 240 Volt Bypass tap factory setting 208 VoltAvailable input voltages hardware modifications Input voltage 208 or 240VacAvailable output voltages hardware modifications Input voltage 120Vac optional, 5/6kVA onlyOutput voltage 208Vac LP 5/6/8/10-11U Output tap change Output voltage 120Vac split-phaseOutput voltage 220/230/240Vac Output voltage 120Vac single phaseOutput Voltage Setup ScreensInput Voltage Input Voltage Change toLP 5/6/8/10-11U Installation of battery pack Installation of parallel operating LP-U UPSs Autorestart OFF Press Enter Autorestart OFF Setting MismatchManual bypass MaintenanceECO-mode No-load shutdownDescription of Front and Rear Panel OperationRear panel Step-up transformer Rear panel of the step-up transformerSelftest Progress Start-upAutonomy Time Left Operating Time 0YEAR 29DAYS Battery 23CUse Input LineStatus and Alarm Menu On Line Alarm Press UPTemp TOO High Battery Depleted Battery Charger no Float Capacitor C1 Capacity LOWInverter OFF Software Version R2.9 FAN Speed INV.DC + Service ScreensService Menu Input and Output not SynchronizedTstamp Q4 Automatic Bypass EnabledFAN Curve Language English Input Voltage Output VoltageOutput Frequency Frequency Range 2% PLL Lock Speed NormalQuick Battery Test Start Automatic Bypass Enabled Service Warning DisabledTest Screens Procedure Deep Battery TestCalibrate BAT Test Activated Utility start Other FeaturesOverload protection in bypass mode ShutdownAuto restart Superior Battery ManagementECO Auto Restart OFF Press EnterRelay Card optional Snmp Interface optional Interfacing FeaturesRS232 / contact interface Emergency shutdownRPA-Facility Redundant Parallel Architecture Optional FeaturesExtended Runtime Plug-in CardsSeismic anchors PDM Power Distribution ModuleCooling fan MaintenanceSafety Recycling the UPS at the end of service lifeSelftest Failure Temp TOO High TroubleshootingSelftest Failure Q4 not OK UPS Type 11U 10-11U SpecificationsAutomatic Bypass Switch Enclosure Center of Gravity Dimensions Conduit BoxLP 5/6/8/10-11U installation drawings LP 5/6/8/10-11U 208-240V input LP 5/6-11U 120V input