g
Digital Energy™ LP Series
4.5.3.2Output voltage 120Vac split-phase
1.The factory setting of the output tap (208Vac) has to be changed to 240Vac. Please refer to fig. 12 and 12a. Proceed as follows:
1.1Remove the yellow wire L from faston 67 (connect) and place this wire on faston 65 (park).
1.2Remove the brown wire F from faston 66 (park) and place this wire on faston 67 (connect).
Output tap factory setting: 208 Volt | Output tap changed to 240 Volt |
(park) | (park) |
(park) | (park) |
(connect) | (connect) |
Figure 12. LP 5/6/8/10-11U:
Output tap change
Figure 12a. LP 5/6/8/10-11U:
Rear view
2.Connect the load wires between the terminals 1 (L1) and 2 (N) (120V), and between the terminals 3 (N) and 4 (L2) (120V). Connect the ground wire to terminal 5. Ground connection is essential! Do not remove the link between terminals 2 and 3. See figure 13.
Figure 13. LP 5/6/8/10-11U:
120 Vac split-phase output connection
3.Return to either 4.5.1.1 step 5 or 4.5.1.2 step 5
LX: OPM_LPU_11U_5K0_10K_1US_V030 | 15 | GE DE LP 11U UPS: Installation / User Manual 3.0 (US) |