Briggs & Stratton 71020, 71021, 71019, 71018 Controls, Supervisory Control Wiring, System Setup

Page 9

8.Connect Neutral conductor from the generator control panel to the transfer switch “NEUTRAL” terminal.

9.Connect generator Ground conductor from the control panel to the transfer switch “GND” terminal.

NOTE: Assure generator equipment grounding conductor is connected per applicable federal, state and local codes, standards and regulations.

10.Connect generator “UTILITY 240 VAC” terminals to transfer switch “UTILITY 240 VAC” terminals. Use minimum #14 AWG conductors.

11.Tighten all wire connections/fasteners to proper torque. See inside transfer switch enclosure for proper torque values.

Supervisory Control Wiring

1.Terminal strip on control module in transfer switch has four connections for customer use. There are two sets of “Normally Closed” contacts available. They will be activated when generator power is required. These can be used for supervisory control of large connected loads on generator. Loads will be allowed to operate if there is enough generator power available.

NOTE: There are two wireways provided to keep the supervisory loads separated from each other.

2.Terminals “A-A” on control module are rated for 24 VAC and air conditioner contactor control. Contacts are connected in series with the air conditioner contactor control circuit (Figure 5).

Air Conditioner Contactor

System Setup

You must perform the following on the control module before operating the system:

If generator is installed in an area regularly subjected to temperatures below 40°F (4°C), select a 50 second warm up time by moving jumper installed on JP2 (Figure 7) from ‘20’ position to ‘50’ position.

Place 2 position switch (Figure 7) in ‘NG’ or ‘LP’ position, whichever is appropriate for your system.

Place 3 position switch (Figure 7) to match KW rating of installed generator.

3 Position

JP2

2 Position

Switch

 

Switch

 

 

CT1 & CT2

 

 

Connectors

 

 

Supervisory

 

 

Contacts

A A

24 VAC

Figure 5 — Terminals “A-A”

3.Terminals “B-B” on control module are rated for 1 Amp 125 VAC and installer supplied contactor to control a large load. Example: electric hot water heater. Contacts are connected in series with the contactor control circuit (Figure 6).

B

Contactor

Neutral

B

120 VAC

 

Figure 6 — Terminals “B-B”

4.Tighten all wire connections/fasteners to proper torque. See inside transfer switch enclosure for proper torque values.

Figure 7 — Control Module

Controls

Other than a Manual Override lever, there are no operator controls because this is an automatic transfer switch. The manual override is to be used only by licensed professionals.

7

Image 9
Contents 100 AMP/200 AMP Call Transfer Switch Helpline BRIGGSandSTRATTON.COMWhere to Find Us Transfer SwitchDate Purchased Table of Contents Important Safety Instructions Introduction Installer ResponsibilitiesFor the Home Owner Owner OrientationShipment Contents InstallationUnpacking Mounting GuidelinesAlternate Transfer Switch Mounting Utility Connnection Power Wiring InterconnectionsSupervisory Control Wiring System SetupControls When Calling the Factory Testing the Automatic Transfer SwitchOperation Automatic SequenceSpecifications MaintenanceUL 1008 Listed Transfer Switch Model Supervisory Contacts RatingProblem Cause Correction TroubleshootingSchematic and Wiring Diagram, Models 071018 Schematic and Wiring Diagram, Models 071020 Illustrated Parts List, Model DescriptionItems Not Illustrated 192597GS DECAL, Utility 240VAC 196094GS ENCLOSURE, 22 x 16 x 197355GS CLIP, Latching Wire192166GS WASHER, Lock 1/4 190984GS DECAL, Fuse197355GS CLIP, Latching Wire 193159GS DECAL, Reinstall Barrier 192151GSASSY, Enclosure 196520GS DECAL, UL ListedASSY, Enclosure 196521GS 197355GS CLIP, Latching Wire 195728GS192879GS INSULATION, Circuit Breaker 196094GS 197294GS DECAL, Contacts Rating WASHER, Lock 1/4 192881GSLimited Warranty Reserved Manual de Instalación Del Operario Dónde puede encontrarnos Conectador AutomáticoFecha de compra Mandos MantenimientoEspecificaciones Instrucciones importantes de seguridad Conserve estas instruccionesPara el Propietario Doméstico IntroduccionOrientación para el Propietario Responsabilidades del InstaladorDesempaque InstalacionPautas de Montaje Inspección al Momento de la EntregaFigura 2 Montaje de un Conectador Alternativo Interconexiones de Cableado de Energía Cableado de Control de Supervisión Configuración del SistemaSistema Funcionamiento MandosPrueba del conectador automático Secuencia AutomáticaEspecificaciones MantenimientoUL 1008 Listó Conectador Modelo Carga máxima/circuitoReparacion de AveriasGarantía Garantía Limitada Reserved Guide dInstallation Et dUtilisation Où nous trouver Commutateur de TransfertDate d’achat Mise à lessai du commutateur de transfert automatique Commandes FonctionnementEntretien CaractéristiquesVeuillez conserver ces instructions Instalación FonctionnementCommandesDirectives de sécurité importantes SécuritéIntroduction Responsabilités de lInstallateurAu Propriétaire Résidentiel Conseils au PropriétaireInstalación Commandes Vérification de la Livraison Consignes dinstallationInstalation DéballageIté Ité Interconnexions du câblage dalimentationEtien RantieCâblage de contrôle Configuration du systèmeFonctionnement CommandesMise à lessai du commutateur de transfert automatique Séquence AutomatiqueCaractéristiques EntretienUL 1008 Enuméré Commutateur de Transfert Modéle ModèleDepannage Garantie Limitée